Energy sold per charging unit per day
Indonesia · kWh per unit per day · observed averages vs what an ultra-fast unit needs to pay back in five years
Ride-hail depot, 20 cars 200 km a day each, our model ~615 2x break-even Break-even, ultra-fast unit 5-year payback, our model ~300 Network average, Lebaran 2026 12-31 Mar, 4,769 units 75 PLN unit, West Java, 2025 501 units, full year 52 a sixth of break-even
Source: [RRI Jan 2026]; [PLN Lebaran 2026]; break-even and depot volumes [Kira estimates] (assumptions on p. 17 and p. 22)

Why the answer is conditional

Demand is real and concentrated. Battery-electric cars took 16.9% of car wholesales in January-August 2026, up from 12.9% in 2025 [detikOto Sep 2026] [Kumparan Jan 2026], and about 63% of electric cars are in Jakarta [Bapenda DKI Jul 2026].

Owners charge at home, so public units sit idle. A PLN unit in West Java sold about 52 kWh a day in 2025; an ultra-fast unit needs about 300 to pay back in five years [Kira estimates].

Fleets cannot charge at home. Grab ran 28,000 EVs in June 2026 and plans to triple them by December [Bisnis Jun 2026]: contracted depot volume is the one load that fills a charger.

Enter as a fleet-hub operator in Greater Jakarta with an anchor contract, sell hardware into the state build-out, and leave outer islands and scooter swapping for later.
Bapenda DKI Jul 2026 = Jakarta revenue agency via DDTC News, 27 Jul 2026 · Bisnis Jun 2026 = Bisnis Indonesia, Grab EV fleet, 9 Jun 2026 · detikOto Sep 2026 = wholesales by powertrain, Aug 2026 · Kumparan Jan 2026 = 2025 car wholesales · PLN Lebaran 2026 = PLN via Kontan, Apr 2026 · RRI Jan 2026 = PLN West Java via RRI, 18 Jan 2026 · Kira estimates = KIRA analyst triangulation

The public network added 114 units in the first five months of 2026; the plan needs 4,741 more by December

Read with the next page: the stall came while battery-electric car sales were doubling.

Public charging units (SPKLU) in operation
Indonesia · units · year-end or month shown · 2026 plan dashed
911 2023 3,772 Mar 2025 4,778 Dec 2025 4,892 May 2026 9,633 Dec 2026 plan +114 units in five months +4,741 needed in seven months
Source: [ESDM 2023 data]; [Katadata Apr 2025]; [ESDM Feb 2026]; [Jawa Pos May 2026]; plan [Kepmen ESDM 24.K/2025]

A fast build that ran out of road

The network grew five-fold in two years. From 911 units in 2023 to 4,778 at 3,093 locations by December 2025 [ESDM 2023 data] [ESDM Feb 2026], led by PLN and its partners.

Then it stopped. May 2026 showed 4,892 units [Jawa Pos May 2026]. The plan calls for 9,633 in 2026, 62,918 by 2030 and about 192,000 by 2034 [Kepmen ESDM 24.K/2025].

Permits are no longer the brake. Since February 2026 an operator needs only a business number (NIB), with no supply-plan requirement [CNN Indonesia Feb 2026].

ImplicationThe constraint is the return per charger, not paperwork. That is what the rest of this report tests.
The plan creates room for about 4,700 units in 2026 alone; who fills it depends on utilisation, not on permits.
CNN Indonesia Feb 2026 = ESDM cuts SPKLU licensing to NIB, 3 Feb 2026 · ESDM Feb 2026 = energy ministry via CNN Indonesia · Jawa Pos May 2026 = ESDM SPKLU count · Katadata Apr 2025 = SPKLU by island, Mar 2025 · Kepmen ESDM 24.K/2025 = SPKLU development plan 2025-2030 · ESDM 2023 data = ESDM 2023 realisation