Malaysia construction market size 2026: MYR 70 bn and where the growth sits

Malaysia's construction market reached MYR 66.3 bn in 2025 after a decade-high 11.4% expansion, normalising to MYR 70.4 bn in 2026 at a 6.1% growth rate. The headline figure masks a sharp shift in composition: non-residential work grew 18.6% year-on-year in Q4 2025, compressing residential's relative weight as data-centre shells and SEZ industrial builds scale. Our analysts model the market reaching roughly MYR 90 bn by 2030, with non-residential and civil segments carrying the growth.

KIRA Research team

Market size & growth: construction Malaysia

A MYR 70.4 bn market in 2026 [GlobalData 2026], compounding at ~6% as the post-2025 surge cools but the base resets higher.

Headline trajectory

Work done rose from MYR 58.8 bn (2024) to MYR 66.3 bn (2025) [DOSM 2025], with 2026 guided to MYR 70.4 bn [GlobalData 2026]. The five-year 2021–25 CAGR of 10.5% [GlobalData 2026] reflects post-pandemic catch-up plus the industrial and DC wave.

Composition is the story

Residential held 44.3% of value in 2025 [GlobalData 2026], but non-residential grew 18.6% YoY in Q4 [DOSM 2025], compressing residential's relative weight as industrial and DC shells scale.

Beyond 2026

Post-2026 the market is modelled to average ~3.5–4.8% annual growth to 2030, reaching roughly MYR 90 bn [GlobalData 2026].

Market size by segment
Stacked output, 2024–2026
MYR bn
58.8202466.3202570.42026 Res · Non-res · Civil · Special trades
GlobalData 2026 · DOSM 2025
GlobalData 2026 = GlobalData Malaysia Construction Industry Report 2026 · DOSM 2025 = Department of Statistics Malaysia, quarterly construction work done

Segment economics: where the value sits

Share and growth diverge sharply — the segments gaining value density are precisely those tied to data centres, the SEZ and the 13MP spine.

SEG 01 · Non-residential
Fastest-value segment
Industrial factories, data-centre shells and SEZ commercial space drive this segment. Per-MW DC construction runs USD 8–10 m [Arizton 2026], lifting non-residential value density well above housing.
+18.6% YoY Q4-25 [DOSM 2025]
SEG 02 · Civil engineering
Highest-velocity infrastructure
Rail, highway, grid and the RTS Link feed a long-cycle book sheltered from residential swings. The 13MP's MYR 430 bn DE pool [EPU 2025] underwrites multi-year visibility.
~9.9% CAGR [Kira estimates]
SEG 03 · Residential
Largest by share, moderating
Affordable-housing programmes (~150,000 planned units) and private launches sustain volume, but urban affordability caps premium expansion. Growth normalises below the headline market rate.
44.3% share, ~7.5% CAGR [GlobalData 2026]
SEG 04 · Special trades & MEP
Margin-rich niche
Mechanical, electrical, plumbing and facade work — disproportionately demanded by data centres and high-spec industrial. Specialists with retrofit divisions capture an outsized slice of incremental value.
15–20% labour saving via IBS [Kira estimates]
READ-ACROSS
Value is rotating from volume to spec
The market's growth is concentrating in non-residential and civil work with higher MEP intensity. Contractors weighted to plain residential volume face the slowest lane; those with industrial, DC and infrastructure capability sit in the fast one. [Kira estimates]
Strategy anchor for Sections 07–08
DOSM 2025 = Department of Statistics Malaysia · GlobalData 2026 = GlobalData Malaysia Construction Industry Report 2026 · Arizton 2026 = Arizton Malaysia Data Center Market 2026 · EPU 2025 = Economic Planning Unit 13MP

5-year outlook & forecast to 2030

After the 2025 surge, the base case is steady mid-single-digit growth to ~MYR 90 bn by 2030 [GlobalData 2026], with data centres and the SEZ the key swing factors.

Construction output forecast
Base case, 2025–2030
MYR bn
66.3202570.4202674.5202779202884202989.92030 Base case · MYR bn construction output
GlobalData 2026 · DOSM 2025 · Kira estimates
BASE
~MYR 90 bn by 2030
Mid-single-digit growth (~3.5–4.8% CAGR) as the DC pipeline converts and 13MP civil work delivers steadily. [GlobalData 2026]
BULL
Faster DC + SEZ conversion
Accelerated Johor power roll-out and full SEZ pipeline could push output meaningfully above base, led by non-residential. [Kira estimates]
BEAR
Power, water & labour bind
Grid constraints, water rules and the ~180k labour gap could delay DC builds and trim civil throughput. [CIDB 2025]
GlobalData 2026 = GlobalData Malaysia Construction Industry Report 2026 · DOSM 2025 = Department of Statistics Malaysia · CIDB 2025 = Construction Industry Development Board · Kira estimates = KIRA analyst triangulation