Executive Summary

Market size 2024
~4.2USD bn
↑ to ~5.6 bn by 2030
Operator filings 2025
Live DC capacity 2025
700+MW
vacancy ~1.4%, lowest in APAC
Structure Research 2024
Allocated via DC-CFA2
200+MW
50% green-energy mandated
IMDA-EDB 2025
Johor pipeline
2,000+MW
spill-over absorbs the overflow
Structure Research 2024

The setup

Singapore's data center market was worth about USD 4.2 bn in 2024, on a path toward ~USD 5.6 bn by 2030 [Operator filings 2025], on a live base above 700 MW with the lowest colocation vacancy in the region, near 1.4% [Structure Research 2024]. After the 2019–2022 build pause, supply is now released in deliberate tranches rather than left to the market.

The gate

The constraint is policy, not land. The Green Data Centre Roadmap released at least 300 MW near-term plus 200 MW more for green deployments [IMDA GDCR 2024], and the DC-CFA2 call (Dec 2025) allocates 200+ MW under a 50% green-energy mandate and a 1.25 PUE bar [IMDA-EDB 2025]. Capacity that cannot clear the gate goes to Johor and Batam.

Released capacity vs spill-over pipeline
SG allocation vs Johor pipeline · MW
MW
0 800 1600 2400 ~500 SG released 700+ SG live 2,000+ Johor pipeline
SOURCE: IMDA, EDB, STRUCTURE RESEARCH, KIRA TRIANGULATION · KIRA RESEARCH 2026
IMDA GDCR 2024 = IMDA Green Data Centre Roadmap, May 2024 · IMDA-EDB 2025 = IMDA & EDB Data Centre Call for Application (DC-CFA2), Dec 2025 · Operator filings 2025 = Listed SG data center operator disclosure 2025 · Structure Research 2024 = Structure Research Singapore & Johor/Batam DCI datasets 2024 · Kira estimates = KIRA in-house analyst triangulation