Executive Summary
The setup
Singapore's data center market was worth about USD 4.2 bn in 2024, on a path toward ~USD 5.6 bn by 2030 [Operator filings 2025], on a live base above 700 MW with the lowest colocation vacancy in the region, near 1.4% [Structure Research 2024]. After the 2019–2022 build pause, supply is now released in deliberate tranches rather than left to the market.
The gate
The constraint is policy, not land. The Green Data Centre Roadmap released at least 300 MW near-term plus 200 MW more for green deployments [IMDA GDCR 2024], and the DC-CFA2 call (Dec 2025) allocates 200+ MW under a 50% green-energy mandate and a 1.25 PUE bar [IMDA-EDB 2025]. Capacity that cannot clear the gate goes to Johor and Batam.