Executive Summary
The setup
Thailand's data center market reached roughly USD 1.9 bn in 2025, on a path toward USD 4.9 bn by 2031 at a ~17% CAGR [DC Portfolio 2025]. Live IT capacity sat near 350 MW exiting 2024 [Bloomberg 2025]. The ambition dwarfs that base: BOI logged 36 data-center applications worth THB 728 bn in 2025 [BOI 2025], with ByteDance alone committing up to USD 8.8 bn across three provinces [DCD 2025].
The constraint
The bottleneck is physical and increasingly green. Hyperscalers tie siting to clean power, so the unlock is the 2,000 MW Direct PPA pilot and the Utility Green Tariff [ERC 2025]. The PDP 2024–2037 plans 73 GW of renewables [PDP 2024], but campus energization tracks grid-connection windows and PPA rules — both of which slipped into review in late 2025.