Executive Summary

Market size 2025
1.04USD bn
↑ to ~3.2 bn by 2031
Arizton 2025
Live DC capacity 2025
~525MW
↑ to ~950 MW by 2030
DC Outlook 2025
HCMC + Hanoi live load
~60MW
vs 500+ MW pipeline
VnEconomy 2025
Build cost per MW
6–8USD mn
lowest in the region
Arizton 2025

The setup

Vietnam's data center market reached USD 1.04 bn in 2025 [Arizton 2025] with installed capacity near 525 MW [DC Outlook 2025], on a path toward ~950 MW by 2030 at a 12.6% CAGR [DC Outlook 2025]. Hyperscale ambition is real: announced and under-construction projects in Ho Chi Minh City alone exceed 500 MW [DCD 2026], anchored by a USD 2 bn G42–Microsoft–FPT campus and Viettel IDC's 140 MW Tan Phu Trung build [Cafef 2025].

The constraint

The bottleneck is physical. Operational load across Hanoi and HCMC was only about 60 MW in 2025 against a national live base near 104 MW [VnEconomy 2025]. Closing the gap to the announced pipeline depends on grid transmission and clean-power access — national demand is set to grow 10.3–12.5% a year through 2030 [MOIT 2025], and high-tech loads already report intermittent supply stress.

Live capacity vs announced pipeline
Vietnam · MW · 2025 actual vs pipeline
MW
0 200 400 600 ~60 HCMC+HN live ~525 VN live total 500+ HCMC pipeline
SOURCE: VNECONOMY, DC OUTLOOK, DCD, KIRA TRIANGULATION · KIRA RESEARCH 2026
Arizton 2025 = Vietnam Data Center Market Investment Analysis 2025 · DC Outlook 2025 = Vietnam Data Center Capacity Outlook to 2031 (industry dataset) · DCD 2026 = Data Center Dynamics HCMC pipeline tracking 2026 · Cafef 2025 = CafeF operator capacity reporting 2025 · VnEconomy 2025 = VnEconomy DC capacity report 2025 · MOIT 2025 = Power Development Plan VIII (adjusted) 2025 · Kira estimates = KIRA in-house analyst triangulation