Executive Summary
The setup
Vietnam's data center market reached USD 1.04 bn in 2025 [Arizton 2025] with installed capacity near 525 MW [DC Outlook 2025], on a path toward ~950 MW by 2030 at a 12.6% CAGR [DC Outlook 2025]. Hyperscale ambition is real: announced and under-construction projects in Ho Chi Minh City alone exceed 500 MW [DCD 2026], anchored by a USD 2 bn G42–Microsoft–FPT campus and Viettel IDC's 140 MW Tan Phu Trung build [Cafef 2025].
The constraint
The bottleneck is physical. Operational load across Hanoi and HCMC was only about 60 MW in 2025 against a national live base near 104 MW [VnEconomy 2025]. Closing the gap to the announced pipeline depends on grid transmission and clean-power access — national demand is set to grow 10.3–12.5% a year through 2030 [MOIT 2025], and high-tech loads already report intermittent supply stress.