Executive summary

Live data-centre IT capacity in 2030 by scenario
Vietnam · MW of operational IT load · ranges, not points · line = live capacity in Oct 2025
02505007501,000Oct 2025: 104 MWA · Sovereign AI corridorpower delivered, AI demand surges750900D · Empty hallspower delivered, demand cools500650Baseline · Telco-led build-outtoday's pipeline lands400500B · Power queuepower rationed, demand surges280380C · Slow lanepower rationed, demand cools200280
Source: [CBRE Nov 2025] for today; scenarios [Kira estimates]

Why the range is wide but one-sided

Demand is not the brake. The digital economy grew 17% to USD 39 bn in 2025 [e-Conomy 2025]; G42 backs three AI and cloud sites with up to USD 1 bn of consumption commitments [G42 Feb 2026].

Power is. Data centres were moved to the business tariff, lifting bills by more than 50% [TechNode Sep 2026], and large sites must build their own 110 kV substations [BPL Aug 2026].

Paper runs ahead of halls. About 1.1 GW sits in named projects, but only about 0.2 GW is under construction [Kira estimates].

Plan on the baseline of about 450 MW, but hold options for the AI corridor; the moves that pay in every future sit in power and equipment, not in halls.
BPL Aug 2026 = Doanh nhan & Phap luat · CBRE Nov 2025 = CBRE via VNA, DTiNews · G42 Feb 2026 = G42, FPT statements · TechNode Sep 2026 = TechNode Global · e-Conomy 2025 = Google, Temasek, Bain · Kira estimates = KIRA analyst triangulation

Vietnam has 104 MW of live IT load; Viettel and VNPT run 67 MW of it, and five players control 97%

Counts differ by scope: 104 MW is operational IT load [CBRE Nov 2025]; the ministry's 182 MW for March 2025 counts installed design capacity [MST Mar 2025].

Live IT capacity by operator
Vietnam · MW · October 2025
Viettel IDC41% share42VNPT25All othersFPT, CMC, STT VNG and more37
Source: [CBRE Nov 2025]; others = total less the two leaders [Kira estimates]
Data-centre facility types in Vietnam
Vietnam · 2026 · examples are illustrative, not complete
TypeExamplesDirection
Telco colocationViettel IDC, VNPT IDC, FPT, CMCMost of today's 104 MW; new hyperscale builds
Carrier-neutral colocationSTT VNG, NTT (building), StarMason (approved)Foreign capital enters through JVs
Cloud and AIFPT Smart Cloud, Viettel Cloud, AWS Local ZoneGPU halls; first hyperscaler zone
StateNational Data CentreGovernment data, live from Aug 2025
Source: [JLL Mar 2026]; [STT GDC May 2024]; [AWS Jun 2026]; [VNA Dec 2025]
The market is concentrated and state-led; a foreign entrant meets Vietnam's telcos as customers, partners and rivals at once.
AWS Jun 2026 = AWS Local Zone notice · CBRE Nov 2025 = CBRE via VNA, DTiNews · JLL Mar 2026 = JLL via VietNamNet · MST Mar 2025 = MST via VietNamNet · STT GDC May 2024 = STT GDC release · VNA Dec 2025 = VNA via DTiNews · Kira estimates = KIRA analyst triangulation