Executive summary

Installed solar capacity, today and in 2030
Malaysia · GW · end-2024 and end-2025 actual; 2030 KIRA base case
4.3End-20245.8End-2025~152030 base
Source: [IEA-PVPS 2026]; [pv magazine Apr 2026]; [Kira estimates] for 2030

The answer in three lines

A 5.8 GW base that grew a third in 2025. Solar rose from 4.3 GW to 5.8 GW [pv magazine Apr 2026; IEA-PVPS 2026]; about 10 GW more is awarded or on offer [Kira estimates].

Growth now comes from big plants and direct deals, not rooftops: LSS6 offers 2,650 MW with 1,250 MW of storage [PETRA Jul 2026], while the new rooftop scheme had only 6.61 MW by April 2026 [Star Jul 2026].

Data centres are the anchor buyer. They need 8,391 MW by 2030 [The Vibes 2026] and must source at least 30% renewable power [Malay Mail Oct 2026].

Treat Malaysia as a large, rule-driven market: the money to 2030 is in storage-backed plants and corporate supply, entered with a Malaysian partner.
IEA-PVPS 2026 = IEA PVPS · Malay Mail Oct 2026 = Malay Mail · PETRA Jul 2026 = Ministry of Energy Transition and Water Transformation (PETRA) · pv magazine Apr 2026 = pv magazine · Star Jul 2026 = The Star · The Vibes 2026 = The Vibes · Kira estimates = KIRA analyst triangulation

Solar capacity rose a third in 2025 to 5.8 GW, and approved large plants already exceed the whole fleet

Consistent yearly series before 2024 differ by source and scope; we anchor on the federal scheme totals.

Installed solar capacity and approvals
Malaysia · MW · cumulative installed under federal schemes; cumulative large-scale solar approvals
4,329End-20245,778End-20256,028LSS approved
Source: [pv magazine Apr 2026]; [IEA-PVPS 2026]; [pv magazine Oct 2025]

The biggest year so far

About 1,448 MW added in 2025, taking the fleet from 4,329 MW to 5,778 MW, a rise of about 33% [pv magazine Apr 2026; Kira estimates].

Scope matters. The total counts the federal schemes (large-scale solar, net metering and feed-in tariff) and leaves out off-grid and most Sarawak capacity [IEA-PVPS 2026].

Approvals run ahead of builds. Large-scale solar alone has approved 6,028 MW to 117 companies since 2016 [pv magazine Oct 2025], against 2,237 MW built [IEA-PVPS 2026].

So what: a pipeline larger than today's fleet is already allocated; the race is to build it.
Size a Malaysian plan on 1.5-2.5 GW of new solar a year, not on the 2025 base alone.
IEA-PVPS 2026 = IEA PVPS · pv magazine Apr 2026 = pv magazine · pv magazine Oct 2025 = pv magazine · Kira estimates = KIRA analyst triangulation