Power plants installed, demand and what the grid delivers
Myanmar · MW · installed capacity, average demand and peak generation on selected dates
Source: [MOEE Oct 2025]; [MOEE Jan 2025]; [MOEE Feb 2026]
Treat Myanmar as a watch-and-supply market: the money is in distributed solar and storage sold through screened partners, not in grid assets.
Burma Campaign 2022 = Burma Campaign UK · FATF Jun 2026 = FATF · Irrawaddy Nov 2026 = The Irrawaddy · MOEE Feb 2026 = Ministry of Electricity and Energy · MOEE Jan 2025 = Ministry of Electric Power statement · MOEE Oct 2025 = Global New Light of Myanmar · Reuters Nov 2025 = Reuters · Kira estimates = KIRA analyst triangulation
Installed capacity rose to 6,357 MW, but the grid has delivered between 1,700 and 3,400 MW since 2025
The number of power stations is not the constraint; fuel, transmission and money are.
Installed capacity against power actually generated
Myanmar · MW · installed capacity and peak or daily generation on dates reported by the ministry
Source: [MOEE Oct 2025]; [RFA Dec 2024]; [MOEE Jan 2025]; [MOEE Feb 2026]; 2020 capacity [MOEE Oct 2025] comparison as reported
Plants without fuel
Capacity grew, output fell. Installed capacity rose about 5% from 2020 to 6,357 MW [MOEE Oct 2025], while peak output fell a third from 3,589 MW in November 2021 to 2,376 MW in November 2024 [RFA Dec 2024].
The low came in January 2025: 1,701 MW on 5 January, after attacks cut 14 transmission links and 1,009 MW [MOEE Jan 2025].
LNG restored some supply. A 500 MW LNG plant ran from 14 January 2026 and output reached about 3,400 MW [MOEE Feb 2026].
So whatthe binding limit is gas and security, not plant count; new plants alone would not close the gap.
Size any plan on delivered megawatts, which swing by half within a year, not on the installed fleet.
MOEE Feb 2026 = Ministry of Electricity and Energy · MOEE Jan 2025 = Ministry of Electric Power statement · MOEE Oct 2025 = Global New Light of Myanmar · RFA Dec 2024 = Radio Free Asia
The answer in three lines
The gap is a third to a half of demand. 6,357 MW is installed [MOEE Oct 2025], yet output ran from 1,701 MW to about 3,400 MW against demand of about 4,400 MW [MOEE Jan 2025; MOEE Feb 2026]; officials expect 70% cover through 2027 [Irrawaddy Nov 2026].
Households and firms are filling it with solar. About 300,000 homes installed systems in 2025 [Reuters Nov 2025]; we size self-supply equipment at USD 0.3-0.4 bn a year [Kira estimates].
Sanctions decide who can serve it. State gas is under EU measures and Myanmar sits on the FATF call-for-action list [Burma Campaign 2022; FATF Jun 2026].