Section 03 · Executive Summary

MINING SERVICES REVENUE 2026E
AUD 52bn
+9% YoY, lithium & copper lead [Kira estimates]
Kira estimates
LITHIUM HYDROXIDE OFFTAKE SIGNED
>800ktpa
Korean + Japanese buyers, 2025-2035 tenors
ASX filings 2025
COPPER MINE CAPEX PIPELINE 2026-28
AUD 18bn
Olympic Dam expansion + 4 greenfield projects
GA 2025
CRITICAL MINERALS STRATEGY FUND
AUD 4bn
Federal commitment 2023-2030 [DISR 2023]
DISR 2023

From extraction to refinery gate

Australia exports roughly 55% of global spodumene concentrate but captures only 12-15% of the final battery-grade lithium hydroxide value chain [GA 2025]. The 2024-2026 period has seen seven announced or under-construction lithium hydroxide conversion plants, driven by the POSCO JV at Pilbara Minerals, the Core Lithium-Samsung SDI arrangement, and the Covalent Lithium (SQM-Wesfarmers) facility at Kwinana [Kira estimates · benchmarked against ASX project announcements].

Copper: Olympic Dam reshapes the map

BHP's Olympic Dam expansion program — targeting 350 ktpa of refined copper by 2030 versus 160 ktpa currently — is the single largest mining-services revenue event of the decade. Engineering, construction, and maintenance services tied to Olympic Dam alone represent an estimated AUD 6.2 bn of contracted work over 2026-2028 [Kira estimates · based on BHP expansion capex of AUD 10.8 bn announced Q4-2025].

Australian mining services revenue pool by commodity
AUD bn · 2024 vs 2026E
AUD BN
0 10 20 30 40 39 9 4.5 2.5 Iron Ore Copper Lithium Other 2024A 2026E
SOURCE: ABS MINING SURVEY, GA RESOURCE ASSESSMENT, ASX PROJECT ANNOUNCEMENTS · KIRA RESEARCH 2026
ABS 2025 = Australian Bureau of Statistics Mining Industry Survey 2024-25 · DISR 2023 = Critical Minerals Strategy 2023-2030 · GA 2025 = Geoscience Australia Resource Assessment 2025 · Kira estimates = KIRA in-house analyst triangulation

Mining services revenue pool and project pipeline

The Australian mining services sector generated an estimated AUD 47.6 bn in 2024 and is forecast to reach AUD 52 bn by end-2026, driven by the copper and lithium downstream build cycle.

Revenue pool composition

Iron ore maintenance and brownfields expansion remains the largest single driver at 75% of total mining services revenue, but its 5-year CAGR has fallen to 2.8% as the Pilbara plateau effect sets in [Kira estimates]. Copper projects — led by Olympic Dam, Carrapateena, and the Prominent Hill expansions — are growing at 18% CAGR, and lithium, while smaller in absolute terms, is growing at 22% CAGR off a low base as battery-grade conversion plants move from feasibility into execution.

Services categories with the highest growth within the pool: process engineering and commissioning (+24% YoY), underground infrastructure and shaft sinking (+19%), and environmental and tailings management (+16%) driven by stricter Class 1 tailings regulation post-2022 [DMIRS 2025].

Capital expenditure pipeline 2026-2028

Geoscience Australia's project pipeline register shows AUD 54 bn of sanctioned or probable mining capital works in Australia for the 2026-2028 window [GA 2025]. Services spend typically captures 40-55% of total capital in construction-phase projects and 15-20% in sustaining-capital phases. Applied to the current mix, this implies a services revenue pulse of AUD 21-29 bn from new project starts alone over the three-year window [Kira estimates].

Concentration risk is high: the top 8 projects account for 67% of the total pipeline by value, with Olympic Dam (BHP), Winu (Rio Tinto copper, WA), and Covalent Lithium (Kwinana) the three largest [GA 2025].

Australian mining capex pipeline 2026-2028 (top projects)
AUD bn · sanctioned + probable
AUD BN
Olympic Dam 10.8 Winu Cu 6.2 Covalent Li 4.5 Carrapateena 3.9 Pilbara P1000 3.2 Core Lithium 1.8 Other Cu 4.1 0 4 8 12 Copper Lithium
SOURCE: GA RESOURCE ASSESSMENT 2025, ASX PROJECT ANNOUNCEMENTS · KIRA RESEARCH 2026
DMIRS 2025 = WA Dept Mines Industry Regulation Safety Tailings Review 2025 · GA 2025 = Geoscience Australia Australian Resource Assessment 2025 · Kira estimates = KIRA in-house analyst triangulation