Indonesia renewable energy 2026: competitive landscape and operator fleet analysis

A concentrated field of seven geothermal operators, led by one state champion and one Barito-backed private group. Pertamina Geothermal Energy and Star Energy together run more than half of the 2.74 GW fleet, with a combined fleet HHI of ~1,900. The structure favours incumbents who already carry proven fields — new entry runs through partnership, not greenfield.

KIRA Research team

Indonesia renewable energy 2026: competitive landscape and operator fleet analysis

A concentrated field of seven geothermal operators, led by one state champion and one Barito-backed private group. Pertamina Geothermal Energy and Star Energy together run more than half the 2.74 GW fleet; the rest sits with Sarulla, Supreme, and a handful of others. The structure favours incumbents who already carry proven fields — new entry runs through partnership, not greenfield.

Star Energy (Barito)
875MW
largest operated fleet
PGE operated
727.5MW
1 GW target 2029 [PGE 2025]
Top-2 fleet share
~58%
fleet HHI ~1,900 [Kira estimates]
Named operators
7
62 work areas staged

Market structure: concentrated, reserve-anchored, hard to enter

Geothermal generation is concentrated to highly concentrated — Pertamina Geothermal Energy (727.5 MW operated) and Star Energy (875 MW gross) together anchor more than half of the 2.74 GW fleet [PGE 2025; Barito 2025]. Top-two groups operate ~1.6 GW of the fleet — roughly 58% combined [Kira estimates from filings]. Fleet HHI is ~1,900 [Kira estimates], inside the moderately-to-highly concentrated band. Proven reserves and 30-year PPAs make the moat durable.

New entry rarely comes greenfield. The viable routes are work-area tender via Genesis, JV with an incumbent reserve holder, or EPC / drilling-service supply — not de-novo exploration at scale.

Operated geothermal capacity by group, 2025
MW · gross / operated · company filings
MW
0 300 600 900 875 728 330 130 ~680 Star PGE Sarulla Supreme Others
SOURCE: PGE 2025, BARITO RENEWABLES 2025, SARULLA OPS, SUPREME ENERGY, KIRA TRIANGULATION · KIRA RESEARCH 2026

Four operator profiles

RANK 01
Star Energy Geothermal
Barito Renewables / Barito Pacific · IDX
Gross MW875
FieldsSalak / WW / Darajat
OwnershipBarito-led
Largest operated fleet; Salak 377 MW, Wayang Windu 347 MW, Darajat 271 MW. Proven mature reservoirs with expansion headroom (Salak binary, WW Unit 3). Ownership consolidated after Green Era acquired the 33.33% BCPG stake for USD 440 m in 2022.
RANK 02
Pertamina Geothermal Energy
Pertamina (state) · IDX:PGEO
Operated MW727.5
2029 target1 GW
Rev 9M-25USD 319 m
State champion, listed 2023. Most active developer — Lumut Balai 2 (+55 MW), Hululais (110 MW), cogen 230 MW pipeline toward 1.8 GW by 2033. IPO raised ~USD 594 m earmarked for the build toward 1 GW.
RANK 03
Sarulla Operations
Medco / INPEX / Ormat / Itochu / Kyushu
Capacity MW330
Structure5-party JV
ProfileSingle field
One of the world’s largest single-contract geothermal projects. International consortium model — the working template for foreign-capital entry via JV. Pools Indonesian, Japanese, and US capital and technology inside one bankable vehicle.
RANK 04
Supreme Energy
Private developer · Sumatra-focused
Capacity MW130
Work areas2 (3 stations)
ProfileMid-tier indep.
Muara Laboh and Rantau Dedap operator. Independent track record through the exploration-risk wall — expansion-stage, positioned to bid for fresh work areas as MEMR Reg 5/2025 shortens the procurement clock.

Entry routes and strategic read

For participants without an existing reserve position, the viable entry routes break into three bands. Work-area tender via Genesis is the cleanest path but demands exploration capital and dry-hole tolerance. JV with an incumbent reserve holder — modelled on Sarulla — shares risk across a multinational consortium and lets foreign technology count toward TKDN compliance inside a bankable structure. EPC and drilling-service supply is the lowest-capital route: PGE alone is the largest single drilling counterparty inside the TKDN-compliant envelope, representing a durable demand anchor for service providers.

The procurement reform under MEMR Reg 5/2025 — a 90-day cap on direct appointment, 180 days on direct selection — disproportionately benefits developers with shovel-ready feasibility and pre-arranged debt. Slow-prep bidders lose the window. Mid-tier independents like Supreme Energy, with proven concession track records, are positioned as natural Genesis-tender beneficiaries and acquisition targets for incumbents seeking to deploy the IPP-mandate capital faster.

SOURCE KEY · Barito 2025 = Barito Renewables / Star Energy Geothermal disclosures 2025 · MEMR Reg 5/2025 = MEMR Regulation No. 5 of 2025 (Renewable PPA Guidelines) · PGE 2025 = Pertamina Geothermal Energy (IDX:PGEO) 2025 disclosures · Supreme/INAGA 2025 = Supreme Energy & Indonesia Geothermal Association operator listing 2025 · ThinkGeo 2026 = ThinkGeoEnergy Indonesia Geothermal Update 2026 · Kira estimates = KIRA in-house analyst triangulation