Executive summary
Live data-centre IT capacity in 2030 by scenario
Thailand · GW of live IT load · ranges, not points · line = live capacity in Q2 2026
Source: [BMI Jun 2026] for today; scenarios [Kira estimates]
Plan on the baseline of about 1.1 GW, but buy options for the AI corridor; the moves that pay in every future sit upstream of the halls.
BMI Jun 2026 = BMI via TechNode · C&W Sep 2026 = Cushman & Wakefield via The Nation · Microsoft 2026 = Microsoft via DCD · MoE Sep 2026 = Energy ministry via The Nation · Nation Aug 2026 = The Nation · NEPC Jul 2026 = NEPC via Thai press · PEA Jun 2026 = PEA via Thansettakij · Kira estimates = KIRA analyst triangulation
Rent earns about USD 135 per kW a month, and the power behind it already costs as much; a THB 6 tariff would make power the larger bill
Operators do not publish prices; we derive rent from disclosed revenue and capacity, and power from the tariff and a typical efficiency ratio.
What one kW of IT load earns and costs each month
Bangkok · USD per kW per month · rent = blended midpoint; power at PUE 1.5 and the stated tariff
Source: rent from USD 175 m 2024 revenue [Arizton 2025] over ~110 MW leased [Kira estimates]; power = 1,095 kWh x tariff [ERC Aug 2026] [Tariff Jun 2026] at THB 35.8 per USD [Nation Sep 2026]
Four revenue streams
Space and power rent is the core: about USD 120-150 per kW a month blended [Kira estimates], higher for small enterprise racks.
Power pass-through is billed on top at cost or a small mark-up; at today's THB 3.89 per unit [ERC Aug 2026] it already equals the rent.
Connectivity and managed services (cross-connects, remote hands, private cloud) earn the highest margins but are a small share; the whole Thai market was about USD 1.45 bn in 2025 [R&M Jan 2026].
WatchA data-centre tariff of THB 5-6 per unit [Tariff Jun 2026] lifts power by 29-55% per kW; tenants, not rent, absorb it.
Whoever controls the price of power controls the tenant's total cost; operators that can offer cheaper green power win the deal, not the cheapest rack.
Arizton 2025 = Arizton colocation report · ERC Aug 2026 = ERC Ft decision via The Nation · Nation Sep 2026 = The Nation · R&M Jan 2026 = ResearchAndMarkets via Business Wire · Tariff Jun 2026 = Energy ministry tariff proposal · Kira estimates = KIRA analyst triangulation
Why the range is wide but one-sided
Demand is not the brake. Two cloud regions are live, Microsoft has pledged over USD 1 bn for 2026-2028 [Microsoft 2026] and pre-leasing rose ninefold in a year [C&W Sep 2026].
The grid is. Data centres have asked for about 35 GW, near the national peak [MoE Sep 2026]; the regional utility can confirm only 18.7% of what it was asked for [PEA Jun 2026].
The rules now ration. The investment board has taken no new data-centre applications since April 2026 [Nation Aug 2026], and a separate, dearer power tariff is coming [NEPC Jul 2026].