Market size
Is there unsold industrial park stock left in Penang, Malaysia?
Penang had zero unsold industrial stock (overhang) in 1Q2026, down from 26 units in 2024 (Edge IPM 2Q2026), according to KIRA's 2026 market overview.
Source: Edge IPM 2Q2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Which Malaysian state holds the most industrial property deal value?
Selangor holds the deepest industrial market, with 46% of national industrial transaction value in January-September 2025 (HB 9M2025), according to KIRA's 2026 market overview.
Source: HB 9M2025, 2025 · KIRA report: Malaysia industrial parks 2026: market overview
How big is the industrial property market in Malaysia?
Industrial property transactions were worth about RM33.8 bn in 2025, up from about RM16.8 bn in 2021 (Kira estimates from NAPIC 2025), according to KIRA's 2026 market overview.
Source: Kira estimates from NAPIC 2025, 2025 · KIRA report: Malaysia industrial parks 2026: market overview
Growth
What does KIRA forecast for industrial property transactions in Malaysia by 2030?
KIRA's base case puts industrial property transactions at about RM47.4 bn in 2030, slower than the past five years, with RM37.3 bn to RM57.0 bn across downside and upside scenarios (Kira estimates), according to KIRA's 2026 market overview.
Source: Kira estimates, 2030 · KIRA report: Malaysia industrial parks 2026: market overview
How fast is industrial property transaction value growing in Malaysia?
Industrial property transaction value grew about 19% a year from 2021 to 2025, reaching RM33.8 bn in 2025 (Kira estimates from NAPIC 2025), according to KIRA's 2026 market overview.
Source: Kira estimates from NAPIC 2025, 2025 · KIRA report: Malaysia industrial parks 2026: market overview
Trends
How much power will data centres in Peninsular Malaysia need by 2030?
Data centres in Peninsular Malaysia need 8,391 MW by 2030, and Johor alone needs 4,428 MW (PETRA 2026), according to KIRA's 2026 market overview.
Source: PETRA 2026, 2030 · KIRA report: Malaysia industrial parks 2026: market overview
How much water will data centres in Johor and Selangor need by 2030?
Data-centre water demand in Johor and Selangor is projected to rise from 63.9 million litres a day today to 389.0 million litres a day by 2030 (PETRA 2026), according to KIRA's 2026 market overview.
Source: PETRA 2026, 2030 · KIRA report: Malaysia industrial parks 2026: market overview
Key players
Who holds the most industrial land in Johor, Malaysia?
JLG holds 12,500 acres of industrial land in Johor, the most of any owner tracked, and has built 34 parks (Edge JLG 2026), according to KIRA's 2026 market overview.
Source: Edge JLG 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Which developer sold the last Quantum Edge plots in Kulai, Malaysia, to a data-centre buyer?
EcoWorld sold the last Quantum Edge plots, 49.6 acres, to a data-centre buyer for RM280.8 m, about two years after launch (Star EcoWorld Apr 2026), according to KIRA's 2026 market overview.
Source: Star EcoWorld Apr 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Pricing
How much does prime industrial land cost in the Klang Valley, Malaysia?
Prime Klang Valley industrial land asks above RM180 psf in 2026 (KF 1H2026), while Penang Science Park asks RM70 psf (Edge IPM 2Q2026), according to KIRA's 2026 market overview.
Source: KF 1H2026; Edge IPM 2Q2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
How much are data-centre buyers paying for industrial land in Malaysia?
Data-centre buyers paid up to RM142 psf of land in 2026 deals, such as the Paragon Globe site at Tanjung Kupang, against RM15-26 psf for raw land (Kira estimates), according to KIRA's 2026 market overview.
Source: Kira estimates, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Regulation
What tax rate applies to new manufacturing investment in Johor's JS-SEZ?
New investment above RM1 bn in qualifying activities pays 5% corporate tax for up to 15 years in the JS-SEZ, against the 24% standard rate (MOF JS-SEZ Jan 2025), according to KIRA's 2026 market overview.
Source: MOF JS-SEZ Jan 2025, 2025 · KIRA report: Malaysia industrial parks 2026: market overview
Market entry
Which Malaysian state scores best for a foreign manufacturer's industrial park?
Johor (Kulai-Senai) scores 3.8 out of 5 for a foreign manufacturer, the highest of the eight states KIRA scored, ahead of Pulau Pinang and Kedah (Kulim) at 3.6 (Kira estimates), according to KIRA's 2026 market overview.
Source: Kira estimates, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
How long does it take to start a plant in a build-to-suit factory in Malaysia?
A build-to-suit factory with a developer or REIT takes 12-18 months to start, against 3-6 months to lease a ready-built factory (Kira estimates), according to KIRA's 2026 market overview.
Source: Kira estimates, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Investment
Which Malaysian state drew the most approved factory investment in the first half of 2026?
Penang drew the most approved manufacturing investment in January-June 2026, RM17.3 bn, ahead of Johor at RM11.8 bn and Selangor at RM9.2 bn (MIDA 1H2026), according to KIRA's 2026 market overview.
Source: MIDA 1H2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
How much of Malaysia's factory investment goes to Penang, Johor and Selangor?
Penang, Johor and Selangor took RM38.3 bn of the RM51.3 bn approved for manufacturing in 1H2026, or 75% (MIDA 1H2026), according to KIRA's 2026 market overview.
Source: MIDA 1H2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Which industrial park under development in Malaysia has the largest planned area?
IBTEC in Kulai, Johor, has a planned 7,290 acres, the largest industrial park under development in Malaysia by planned area (Edge JLG 2026), according to KIRA's 2026 market overview.
Source: Edge JLG 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
How much investment has the Johor-Singapore Special Economic Zone approved?
The JS-SEZ had RM88.83 bn of investment approved from January 2025 to June 2026, of which RM40.3 bn was realised (JSCMC Nov 2026), according to KIRA's 2026 market overview.
Source: JSCMC Nov 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Which foreign country was the largest investor in Malaysia in the first half of 2026?
The United States was the largest foreign investor in 1H2026 at RM33.1 bn, with Singapore second at RM25.9 bn (MIDA 1H2026), according to KIRA's 2026 market overview.
Source: MIDA 1H2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
How much manufacturing investment was approved in Malaysia in the first half of 2026?
Malaysia approved RM51.3 bn of manufacturing investment in January-June 2026, across 973 projects (MIDA 1H2026), according to KIRA's 2026 market overview.
Source: MIDA 1H2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Risks
Has an anchor tenant left a Malaysian industrial park in 2026?
Yes: BYD dropped its 150-acre plant at KLK TechPark in September 2026, and the park lost its anchor (EdgeProp KLK Sep 2026), according to KIRA's 2026 market overview.
Source: EdgeProp KLK Sep 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
What is the biggest risk when entering a Malaysian industrial park?
A grid connection delay for a new plant is the highest-scored park-entry risk, at likelihood 4 and impact 5 out of 5 (Kira estimates), according to KIRA's 2026 market overview.
Source: Kira estimates, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Other questions
How many free industrial zones does Malaysia have for export manufacturers?
Malaysia has 21 free industrial zones out of 48 free zones, and Bayan Lepas in Penang is the best known, offering duty-free import of inputs for export makers (MITI FIZ 2026), according to KIRA's 2026 market overview.
Source: MITI FIZ 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
How full is the first phase of Tanjong Malim Hi-Tech Park in Perak, Malaysia?
Tanjong Malim Hi-Tech Park's first phase is 50% taken up, in a 447-acre park (EdgeProp KLK Sep 2026), according to KIRA's 2026 market overview.
Source: EdgeProp KLK Sep 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview
Did Phase 3A of Kulim Hi-Tech Park in Kedah, Malaysia, sell out?
Phase 3A of Kulim Hi-Tech Park in Kedah sold out on launch day (MIDA KHTP; EdgeProp KHTP 2026), according to KIRA's 2026 market overview.
Source: MIDA KHTP; EdgeProp KHTP 2026, 2026 · KIRA report: Malaysia industrial parks 2026: market overview