Key questions
How much of Brunei's installed solar sits with industrial owners?
Of 63 MWp of solar installed in August 2026, 50 MWp sits inside one refinery, according to Hansard Aug 2026, MoFE Feb 2026 and KIRA's 2026 trends and outlook.
Source: Hansard Aug 2026, 2026 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
How much could a foreign company invest in its first Brunei solar position?
KIRA estimates a first-horizon budget of US$1-3 mn for a 2026-2027 position in Brunei solar, such as a local partner and an awarded lot, according to KIRA's 2026 trends and outlook.
Source: Kira estimates, 2027 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
Can a foreign company bid for Brunei's government rooftop solar tender?
Foreign firms may bid for SolarGov phase 1 only in a joint venture with a registered local company, for up to 13 MWp across five government buildings, with bids closed on 23 June 2026, according to pv magazine Jun 2026, according to KIRA's 2026 trends and outlook.
Source: pv magazine Jun 2026, 2026 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
How much solar capacity would Brunei need to reach 30% renewables by 2035?
KIRA estimates that reaching the 30% renewables share by 2035 needs roughly 380-490 MW of solar, with a midpoint of 435 MWp, according to KIRA's 2026 trends and outlook.
Source: Kira estimates, 2035 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
How much solar could Brunei have installed by 2030?
KIRA estimates Brunei's installed solar could reach 145-370 MWp by 2030, depending on tender pace and captive build, with a base case of 270 MWp, according to KIRA's 2026 trends and outlook.
Source: Kira estimates, 2030 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
How much solar capacity will Brunei have by end-2026?
KIRA estimates Brunei's installed solar will reach about 121 MWp by end-2026 as projects already under way come online, according to KIRA's 2026 trends and outlook.
Source: Kira estimates, 2026 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
Where is the largest candidate site for floating solar in Brunei?
The largest candidate floating solar site in Brunei is Brunei Bay by the Temburong Bridge, estimated at 640 MW, according to ERIA 2023 and KIRA's 2026 trends and outlook.
Source: ERIA 2023, 2023 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
Who is building the largest solar plant in Brunei?
Hengyi Industries runs Project SINAR stage 1, a captive solar plant above 50 MWp with 24 MWh of storage at a refinery, operating since February 2026, according to MoFE Feb 2026 and KIRA's 2026 trends and outlook.
Source: MoFE Feb 2026, 2026 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
Who owns the Kampong Belimbing solar project company in Brunei?
The Belimbing project company is owned 36% by Serikandi Oilfield Services (local), 34% by Atlantic Blue (Solarvest, Malaysia) and 30% by Khazanah Satu (state), according to Solarvest Jun 2025 and KIRA's 2026 trends and outlook.
Source: Solarvest Jun 2025, 2025 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
How much utility-scale solar capacity is installed in Brunei today?
Brunei had about 63 MWp of solar installed in August 2026, up from 7 MWp in 2024, according to Hansard Aug 2026 and KIRA's 2026 trends and outlook.
Source: Hansard Aug 2026, 2026 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
How much did the Kampong Belimbing solar plant cost in Brunei?
The Kampong Belimbing solar plant in Brunei cost BND 34 mn (US$26.5 mn) for 46 MWp (30 MWac), according to Solarvest Jun 2025 and KIRA's 2026 trends and outlook.
Source: Solarvest Jun 2025, 2025 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
What do solar modules cost per watt for a Brunei project?
Solar modules cost about US$0.109 per W for the 46 MWp Belimbing plant, according to OPIS Jul 2026 and KIRA's 2026 trends and outlook.
Source: OPIS Jul 2026, 2026 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
How long is the power purchase agreement for a utility-scale solar plant in Brunei?
State power purchase agreements for utility-scale solar in Brunei run 25 years from commercial operation, with the Department of Energy buying all output, according to Solarvest Jun 2025 and KIRA's 2026 trends and outlook.
Source: Solarvest Jun 2025, 2025 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
What does a solar plant in Brunei cost to produce power per MWh?
KIRA estimates the levelised cost of Belimbing's solar output at US$41 per MWh, against a value of US$97-122 per MWh for the gas it frees, according to KIRA's 2026 trends and outlook.
Source: Kira estimates · KIRA report: Brunei utility-scale solar 2026: trends and outlook
Did Brunei meet its 2025 solar capacity goal?
No: Brunei's 2025 solar goal was 200 MW and was missed, with about 63 MWp installed in August 2026, according to DoE Apr 2025, Hansard Aug 2026 and KIRA's 2026 trends and outlook.
Source: DoE Apr 2025, 2025 · KIRA report: Brunei utility-scale solar 2026: trends and outlook
More on Utility-scale solar in Brunei