SINGAPORE · DATA CENTER · MARKET ANALYSIS

Singapore's data center allocation regime — capacity, the green gate, and the spill-over

Executive summary

Singapore's data center market was worth about USD 4.2 bn in 2024, on a path toward ~USD 5.6 bn by 2030 [Operator filings 2025], on a live base above 700 MW with the lowest colocation vacancy in the region, near 1.4% [Structure Research 2024]. Post-moratorium, capacity is released in deliberate tranches: a green-energy gate, not demand, decides what lands in Singapore — and pushes the remainder offshore to Johor and Batam [IMDA-EDB 2025].

Singapore's data center market was worth about USD 4.2 bn in 2024, on a path toward ~USD 5.6 bn by 2030 [Operator filings 2025], on a live base above 700 MW with the lowest colocation vacancy in the region, near 1.4% [Structure Research 2024]. After the 2019–2022 build pause, supply is now released in deliberate tranches rather than left to the market.

The constraint is policy, not land. The Green Data Centre Roadmap released at least 300 MW near-term plus 200 MW more for green deployments [IMDA GDCR 2024], and the DC-CFA2 call (Dec 2025) allocates 200+ MW under a 50% green-energy mandate and a 1.25 PUE bar [IMDA-EDB 2025]. Capacity that cannot clear the gate goes to Johor and Batam.

Report details

Published
2026-06-09
Pages
17
Format
PDF
Code
SG-DCT-XPL-D27-01
Market
Singapore
Industry
Data Center
Year
2026

Table of contents · 10 sections

  1. 03 Executive summary
  2. 03 Strategic implications
  3. 04 Market sizing & trajectory
  4. 04 Demand drivers
  5. 05 Power & sustainability
  6. 05 Capacity allocation
  7. 06 The overseas spill-over
  8. 06 Competitive structure
  9. 07 2027 outlook & scenarios
  10. 07 Methodology & sources

The full report is available to subscribers and buyers. The executive summary above is free to read.

Key questions

How large is Johor's data center pipeline?

Johor's data center pipeline is more than 2,000 MW and absorbs capacity that cannot land in Singapore, according to KIRA's 2027 market report (Structure Research 2024).

Source: Structure Research 2024, 2024 · KIRA report: Singapore's data center allocation regime — capacity, the green gate, and the spill-over

How much live data center capacity does Singapore have?

Singapore had more than 700 MW of live data center capacity in 2025, with vacancy near 1.4%, the lowest in APAC, according to KIRA's 2027 market report (Structure Research 2024).

Source: Structure Research 2024, 2025 · KIRA report: Singapore's data center allocation regime — capacity, the green gate, and the spill-over

How much near-term capacity did Singapore's Green Data Centre Roadmap release?

The Green Data Centre Roadmap released at least 300 MW near term, plus 200 MW more for green deployments, according to KIRA's 2027 market report (IMDA GDCR 2024).

Source: IMDA GDCR 2024, 2024 · KIRA report: Singapore's data center allocation regime — capacity, the green gate, and the spill-over

How big is Singapore's data center market?

Singapore's data center market was worth about USD 4.2 bn in 2024 and is set to reach about USD 5.6 bn by 2030, according to KIRA's 2027 market report (Operator filings 2025).

Source: Operator filings 2025, 2024 · KIRA report: Singapore's data center allocation regime — capacity, the green gate, and the spill-over

What PUE bar must new Singapore data center capacity meet?

The DC-CFA2 call sets a 1.25 PUE bar for new capacity, according to KIRA's 2027 market report (IMDA-EDB 2025).

Source: IMDA-EDB 2025, 2025 · KIRA report: Singapore's data center allocation regime — capacity, the green gate, and the spill-over

How much data center capacity does Singapore allocate under DC-CFA2?

The DC-CFA2 call allocates more than 200 MW under a 50% green-energy mandate, according to KIRA's 2027 market report (IMDA-EDB 2025).

Source: IMDA-EDB 2025, 2025 · KIRA report: Singapore's data center allocation regime — capacity, the green gate, and the spill-over