Thailand's data center market reached roughly USD 1.9 bn in 2025, on a path toward USD 4.9 bn by 2031 at a ~17% CAGR [DC Portfolio 2025]. Live IT capacity sat near 350 MW exiting 2024, against a 2027 ambition near 1 GW [Bloomberg 2025]. A multi-billion-dollar hyperscaler pipeline concentrates in the Eastern Economic Corridor — but firm, clean power through Direct PPA and the Utility Green Tariff, not demand, decides how much energizes by 2027 [ERC 2025].

Executive summary

Thailand's data centre market is valued at approximately $1.8 billion in 2025 and is expanding at 18% CAGR, driven by digital government infrastructure investment, cloud adoption by Thai enterprises, and Thailand's strategic positioning as an ASEAN data centre hub alternative to Singapore. The Eastern Economic Corridor (EEC) is the primary investment zone, with hyperscaler co-location facilities from AIS DataCenter, True IDC, DTAC, and international operators including NTT and ST Telemedia. Thailand's competitive advantage versus Malaysia and Indonesia includes a more mature power grid, skilled workforce availability, and bilateral data connectivity agreements. Government BOI incentives offer 8-year corporate income tax exemptions for qualifying data centre investments. Power cost and renewable energy availability are key competitive variables as hyperscalers target 100% renewable energy commitments. This report covers Thailand's data centre market capacity and pipeline, operator competitive landscape, EEC zone development, power and connectivity infrastructure, BOI incentive framework, and the investment outlook through 2026.

Report details

Published
2026-06-05
Pages
17
Format
PDF
Code
TH-DCT-XPL-D26-01
Market
Thailand
Industry
Data Center
Year
2026

Table of contents · 10 sections

  1. 03 Executive summary
  2. 03 Strategic implications
  3. 04 Market sizing & trajectory
  4. 04 Demand drivers
  5. 05 Power & the grid
  6. 05 The operational gap
  7. 05 PPA structures & rules
  8. 06 Competitive structure
  9. 07 2027 outlook & scenarios
  10. 07 Methodology & sources

The full report is available to subscribers and buyers. The executive summary above is free to read.

Key questions

How fast will the data center market in Thailand grow to 2031?

The market is on a path toward about USD 4.9 bn by 2031, a forecast KIRA gives at a CAGR of about 17%, according to KIRA's 2026 market report (DC Portfolio 2025).

Source: DC Portfolio 2025, 2031 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

What is Thailand's data center capacity target for 2027?

Capacity is expected to reach about 1 GW by 2027, a target rather than live capacity, according to KIRA's 2026 market report (Bloomberg 2025).

Source: Bloomberg 2025, 2027 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

How much data center investment has been filed with BOI in Thailand?

BOI logged 36 data-center applications worth THB 728 bn in 2025, according to KIRA's 2026 market report (BOI 2025).

Source: BOI 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

How much has ByteDance committed to data centers in Thailand?

ByteDance has pledged up to USD 8.8 bn for data centers across three Thai provinces, according to KIRA's 2026 market report (DCD 2025).

Source: DCD 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

Which hyperscalers are building data centers in Thailand?

AWS, Google and ByteDance are building data center capacity in Thailand, with Google building a Chonburi campus, according to KIRA's 2026 market report (DCD 2025).

Source: Kira estimates, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

How big is the data center market in Thailand?

Thailand's data center market was about USD 1.9 bn in 2025, according to KIRA's 2026 market report (DC Portfolio 2025).

Source: DC Portfolio 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

How much data center capacity is live in Thailand?

About 350 MW of IT capacity was live in Thailand at the end of 2024, according to KIRA's 2026 market report (Bloomberg 2025).

Source: Bloomberg 2025, 2024 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

Where in Thailand are data centers being built?

Rayong and Chonburi anchor Thailand's data center build in the Eastern Economic Corridor, which pairs tax holidays and duty-free imports with cable-landing access, according to KIRA's 2026 market report (DCD 2025).

Source: DCD 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

How much renewable capacity does Thailand's power plan include?

Thailand's PDP 2024-2037 plans 73 GW of renewables by 2037, according to KIRA's 2026 market report (PDP 2024).

Source: PDP 2024, 2037 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

Does Thailand's government policy create demand for data centers?

The Go Cloud First policy, effective October 2025, mandates cloud priority for government IT, a demand floor independent of the AI cycle, according to KIRA's 2026 market report (DEPA 2025).

Source: DEPA 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

How much capacity is in Thailand's Direct PPA pilot for data centers?

A 2,000 MW Direct PPA pilot pool is under criteria review at the ERC, and it is the mechanism that unlocks clean power for campuses, according to KIRA's 2026 market report (ERC 2025).

Source: ERC 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

How much hydropower-backed green supply does Thailand's Utility Green Tariff provide?

The Utility Green Tariff launched UGT1 in January 2025 with about 2,000 GWh of hydropower-backed supply, according to KIRA's 2026 market report (UGT 2025).

Source: UGT 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

What limits how fast data centers energize in Thailand?

Firm renewable power, not demand, sets the pace at which Thai campuses energize, because campuses depend on grid-connection windows and PPA rules, according to KIRA's 2026 market report (PDP 2024; ERC 2025).

Source: ERC 2025, 2025 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate

What is the 2027 outlook for Thailand's data centers?

KIRA's 2027 scenarios for Thailand's data centers (base, accelerated, constrained) hinge on whether firm renewable power and grid windows arrive on time (KIRA estimates), according to KIRA's 2026 market report.

Source: Kira estimates, 2027 · KIRA report: Thailand's data center EEC bet — hyperscaler builds and the renewable-power gate