The tension: renewables are 31% of capacity, yet solar made only 2.4% of Peninsular power in 2025. Treat Malaysia as a large, rule-driven market: the money to 2030 is in storage-backed plants and corporate supply, entered with a Malaysian partner.

A 5.8 GW base that grew a third in 2025. Solar rose from 4.3 GW to 5.8 GW; about 10 GW more is awarded or on offer.

Growth now comes from big plants and direct deals, not rooftops: LSS6 offers 2,650 MW with 1,250 MW of storage, while the new rooftop scheme had only 6.61 MW by April 2026.

Report details

Published
2026-11-04
Pages
42
Format
PDF
Code
MY-ENR-XPL-D26-01
Market
Malaysia
Industry
Energy
Year
2026

Table of contents · 8 sections

  1. ES Executive summary
  2. 01 A 5.8 GW solar base, up a third in one year
  3. 02 Rooftops built the base; big plants and corporate deals build the rest
  4. 03 Demand is not the limit; grid, land and quotas are
  5. 04 Malaysian groups own the awards, contractors with storage gain
  6. 05 Enter through storage and corporate supply, with a Malaysian partner
  7. 06 Who's who in Malaysian solar and renewable power
  8. 07 Methodology and sources

The full report is available to subscribers and buyers. The executive summary above is free to read.

Key questions

How much corporate solar is registered under CRESS?

About 3000 MW of solar is registered under CRESS, the corporate supply scheme, according to KIRA's 2026 market overview (Bernama May 2026).

Source: Bernama May 2026, 2026 · KIRA report: Malaysia solar and renewable power 2026: market overview

How is Malaysia's installed solar split across schemes?

Net metering (rooftop) held 2748 MW and large-scale solar 2237 MW of installed solar at end-2025, with feed-in tariff at 345 MW, according to KIRA's 2026 market overview (IEA-PVPS 2026).

Source: IEA-PVPS 2026, 2025 · KIRA report: Malaysia solar and renewable power 2026: market overview

What is the range of Malaysia's 2030 solar capacity outlook?

KIRA estimates 2030 solar capacity between 12 GW (low) and 18 GW (high), with 15 GW as the base case, from 5.8 GW at end-2025, according to KIRA's 2026 market overview.

Source: Kira estimates, 2030 · KIRA report: Malaysia solar and renewable power 2026: market overview

How much new solar investment is projected to 2035?

The projection of new solar to 2035 is worth RM93 bn, against RM4.3 bn of solar built in 2025 (KIRA estimate), according to KIRA's 2026 market overview (Star Oct 2026b).

Source: Star Oct 2026b, 2035 · KIRA report: Malaysia solar and renewable power 2026: market overview

What budget should a foreign entrant plan for a stake in a storage-backed CRESS project?

KIRA estimates US$40-120 mn of equity to take a 20-49% stake in a storage-backed CRESS project reaching operation by end-2028, plus US$2-5 mn for an early storage supply position, according to KIRA's 2026 market overview.

Source: Kira estimates, 2028 · KIRA report: Malaysia solar and renewable power 2026: market overview

Which solar segments score highest for a Japanese or Korean entrant?

For a Japanese or Korean company, KIRA scores corporate supply with storage highest at 8.6 for attractiveness and 8.2 for ability to win, on a 0-10 scale, according to KIRA's 2026 market overview.

Source: Kira estimates, 2026 · KIRA report: Malaysia solar and renewable power 2026: market overview

Which solar player groups are gaining or losing share in Malaysia?

Storage-ready contractors and TNB are gaining, with Solarvest holding an RM2.371 bn order book, while rooftop installers are losing after Solar ATAP reached only 6.61 MW by April 2026, according to KIRA's 2026 market overview.

Source: Kira estimates, 2026 · KIRA report: Malaysia solar and renewable power 2026: market overview

How much solar and storage does LSS6 offer, and by when must it reach operation?

LSS6 offers 2650 MW of solar and 1250 MW of storage, with commercial operation due by 31 December 2029 and RM13-15 bn of investment, according to KIRA's 2026 market overview (PETRA Jul 2026).

Source: PETRA Jul 2026, 2026 · KIRA report: Malaysia solar and renewable power 2026: market overview

How big is Malaysia's installed solar capacity, and how fast is it growing?

Installed solar reached 5.78 GW at end-2025, up from 4.33 GW at end-2024, according to KIRA's 2026 market overview (IEA-PVPS 2026).

Source: IEA-PVPS 2026, 2025 · KIRA report: Malaysia solar and renewable power 2026: market overview

How much large-scale solar has Malaysia approved to date?

Large-scale solar approvals reached 6028 MW by October 2025, against 5778 MW installed under federal schemes at end-2025, according to KIRA's 2026 market overview.

Source: pv magazine Oct 2025, 2025 · KIRA report: Malaysia solar and renewable power 2026: market overview

What share of Peninsular Malaysia's electricity came from solar in 2025?

Solar supplied 2.4% of Peninsular Malaysia's electricity in 2025, against 58.6% from coal and 33.1% from gas, according to KIRA's 2026 market overview (Reuters Jan 2026).

Source: Reuters Jan 2026, 2025 · KIRA report: Malaysia solar and renewable power 2026: market overview

How much solar module capacity does Malaysia make compared with what it installs?

Malaysia had 23.6 GW of solar manufacturing capacity in 2024, of which 18.6 GW was Chinese-owned, against about 1.45 GW installed in Malaysia in 2025, according to KIRA's 2026 market overview (Wood Mackenzie 2025).

Source: Wood Mackenzie 2025, 2024 · KIRA report: Malaysia solar and renewable power 2026: market overview

What is the 2026 grid-access charge for corporate solar buyers in Malaysia?

The CRESS grid-access charge is 18 sen per kWh all-in after the September 2026 package, down from 20 sen, against a 45.62 sen base tariff, according to KIRA's 2026 market overview (Star Oct 2026a).

Source: Star Oct 2026a, 2026 · KIRA report: Malaysia solar and renewable power 2026: market overview

How much of LSS6 is reserved for Bumiputera bidders?

450 MW of LSS6 solar is reserved for Bumiputera companies in Packages 2 and 3, according to KIRA's 2026 market overview (PETRA Jul 2026).

Source: PETRA Jul 2026, 2026 · KIRA report: Malaysia solar and renewable power 2026: market overview

What is the biggest constraint on Malaysian solar growth?

Grid connection is rated the highest constraint: TNB's RM42.8 bn grid capex for 2025-2027 sets the pace of plant start-ups, and over two-thirds of LSS4 capacity missed its end-2023 start date, according to KIRA's 2026 market overview (KIRA assessment).

Source: KIRA research, 2027 · KIRA report: Malaysia solar and renewable power 2026: market overview