Indonesia renewable energy 2026: the geothermal pipeline and the procurement reset
Indonesia's 2.74 GW geothermal fleet ranks second worldwide yet taps barely 12% of the resource. RUPTL 2025-2034 asks for 52.9 GW of renewables and storage through 2034 — 73% of it private-built — while MEMR Regulation 5/2025 rebuilds the PLN procurement clock. The next 24 months separate the developers that clear the new gate from those stuck at exploration risk. Strategic outlook through 2030.
Executive summary
Indonesia has committed to achieving 23% renewable energy in its primary energy mix by 2025 — currently tracking at approximately 13% — and a net-zero emissions target by 2060. The archipelago has exceptional renewable potential: an estimated 434 GW of solar, 95 GW of geothermal (the world's largest), 75 GW of hydro, and 60 GW of wind. The Just Energy Transition Partnership (JETP) — a $20 billion financing commitment from G7 nations — is intended to accelerate coal phase-out and renewable deployment. Geothermal is the strategic priority given its baseload characteristics. Solar is expanding rapidly, led by utility-scale IPPs. This report covers Indonesia's renewable energy policy framework, capacity installation by technology, PLN's transition strategy, JETP implementation progress, investment environment for foreign IPPs, and the pathway to 2030 targets.
Report details
- Published
- 2026-05-29
- Pages
- 29
- Format
- Code
- ID-ENR-XPL-D26-01
- Market
- Indonesia
- Industry
- Renewable Energy
- Year
- 2026
Table of contents · 12 sections
- 01 Methodology
- 02 Contents
- 03 Executive summary
- 04 Macro context
- 05 Sector overview & sizing
- 06 Segment economics
- 07 Competitive landscape
- 08 Demand drivers & offtake
- 09 Regulatory & procurement
- 10 AI impact
- 11 5-year outlook & forecast
- 12 Methodology endnote
The full report is available to subscribers and buyers. The executive summary above is free to read.