KOREA · SHIPBUILDING · MARKET ANALYSIS

Korea shipbuilding 2027 — LNG carriers hold the order book, offshore wind vessels open the next leg

Executive summary

Korea's big three yards control the LNG carrier order book and have extended their lead by locking in a wave of contracts through 2028. The near-term story is margin recovery from a historically weak 2022-23 cycle; the medium-term prize is the offshore wind installation vessel. Both are structural, not cyclical.

Korea's big three — HD Hyundai Heavy Industries (HD HHI), Hanwha Ocean, and Samsung Heavy Industries (SHI) — collectively hold a combined backlog estimated at USD ~64 bn, with LNG carriers accounting for 55-60% of units [Kira estimates]. New-build prices for 174,000 cbm LNG carriers hit USD 262 m in early 2026, up from USD 189 m at the 2021 trough, as global LNG demand from Europe and East Asia locks in long-term supply agreements [Clarkson 2026].

The 2022-23 cycle was marked by fixed-price legacy contracts signed when steel costs surged. HD HHI's shipbuilding operating margin recovered to 7.4% in FY25 from near breakeven in FY23 [HD HHI FY25]. Hanwha Ocean and SHI are tracking a similar lag trajectory. All three have now repriced backlogs; the new contracts carry better pass-through provisions.

Report details

Published
2026-06-10
Pages
14
Format
PDF
Code
KR-MFG-XPL-D27-01
Market
South Korea
Industry
Shipbuilding
Year
2026

The full report is available to subscribers and buyers. The executive summary above is free to read.

Key questions

How big will the offshore wind installation vessel market be by 2030?

The offshore wind installation vessel (WTIV) market is forecast at USD 8.4 bn by 2030, according to KIRA estimates in KIRA's 2026 market report.

Source: Kira estimates, 2030 · KIRA report: Korea shipbuilding 2027 — LNG carriers hold the order book, offshore wind vessels open the next leg

What operating margin does HD Hyundai Heavy Industries earn on shipbuilding?

HD Hyundai Heavy Industries' shipbuilding operating margin recovered to 7.4% in FY25 from near breakeven in FY23, according to KIRA's 2026 market report (HD HHI FY25).

Source: HD HHI FY25, 2025 · KIRA report: Korea shipbuilding 2027 — LNG carriers hold the order book, offshore wind vessels open the next leg

What share of global LNG carrier orders does Korea hold?

Korea holds about 73% of global new LNG carrier orders in 2025, with China at about 24%, according to KIRA's 2026 market report (KSA 2026).

Source: KSA 2026, 2025 · KIRA report: Korea shipbuilding 2027 — LNG carriers hold the order book, offshore wind vessels open the next leg

How big is the order backlog of Korea's big three shipyards?

Korea's big three shipyards hold a combined order backlog estimated at USD 64 bn, according to KIRA estimates in KIRA's 2026 market report.

Source: Kira estimates · KIRA report: Korea shipbuilding 2027 — LNG carriers hold the order book, offshore wind vessels open the next leg

How much does an LNG carrier cost to build in Korea?

New-build prices for 174,000 cbm LNG carriers reached USD 262 m in early 2026, up from USD 189 m at the 2021 trough, according to KIRA's 2026 market report (Clarkson 2026).

Source: Clarkson 2026, 2026 · KIRA report: Korea shipbuilding 2027 — LNG carriers hold the order book, offshore wind vessels open the next leg