VIETNAM · SOLAR · MARKET ANALYSIS

Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

Executive summary

Vietnam's installed solar base hit ~20.7 GWp by end-2025, covering roughly 25% of total generation capacity. The Decree 135/2024 commercial DPPA framework activated rooftop PPA contracting at scale for the first time.

The binding constraint for 2027-30 is not solar demand — it is transmission capacity from the south-central solar belt to load centres. First signed DPPAs are priced at VND 1,450-1,700/kWh, a 15-25% discount to the industrial retail tariff.

Our base case reaches ~35 GWp by end-2027 and ~50 GWp by 2030 — 68% of PDP8's 73.4 GWp target. The gap is entirely driven by whether EVN's 500kV and 220kV grid expansion runs on schedule.

Report details

Published
2026-06-11
Pages
16
Format
PDF
Code
VN-ENR-XPL-D27-01
Market
Vietnam
Industry
Solar
Year
2026

The full report is available to subscribers and buyers. The executive summary above is free to read.

Key questions

Where is the under-penetrated solar market in Vietnam?

Vietnam's north has under 5% of installed solar against about 70% of industrial load, according to KIRA estimates in its 2027 market report, which makes north-of-load C&I solar a lower-risk option.

Source: EVN 2025, 2025 · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

What solar capacity does Vietnam's PDP8 plan target for 2030?

The PDP8 plan targets 73.4 GWp of solar by 2030, 52.7 GWp above the 2025 base, according to KIRA's 2027 market report (PDP8 2023).

Source: PDP8 2023, 2030 · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

How large is the commercial rooftop solar pipeline in Vietnam?

KIRA estimates a 2.8 GWp rooftop pipeline of C&I DPPA-eligible capacity for 2026-27, according to its 2027 market report.

Source: Kira estimates, 2027 · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

How much solar capacity has Vietnam installed?

Vietnam's installed solar base reached about 20.7 GWp by end-2025, roughly 25% of total generation capacity, according to KIRA's 2027 market report (EVN 2025).

Source: EVN 2025, 2025 · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

What tariff do the first rooftop direct power purchase agreements carry in Vietnam?

The first signed rooftop direct power purchase agreements are priced at VND 1,450-1,700 per kWh, a 15-25% discount to the industrial retail tariff, according to KIRA estimates in the 2027 market report.

Source: Kira estimates · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

What does Decree 135/2024 change for solar in Vietnam?

Decree 135/2024 enabled commercial direct power purchase agreements between rooftop solar operators and industrial off-takers, effective November 2024, according to KIRA's 2027 market report (MOIT 2024).

Source: MOIT 2024, 2024 · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

How much stranded solar capacity could grid completions unlock in Vietnam?

EVN's 2026-27 grid investment plan is expected to unlock about 8-10 GW of stranded south-central solar capacity, according to KIRA's 2027 market report (EVN Grid 2025).

Source: EVN Grid 2025, 2027 · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks

How much solar output is curtailed in Vietnam's south-central corridor?

Curtailment in Vietnam's south-central solar corridor peaked at about 25% in Q2 2025, according to KIRA's 2027 market report (NLDC 2025).

Source: NLDC 2025, 2025 · KIRA report: Vietnam solar 2027: rooftop PPA market and utility-scale grid bottlenecks