THAILAND · DATA CENTERS & CLOUD · MARKET SCAN

Thailand data centres 2026: trends and outlook

Which shifts will reshape the market, and who gains when they do?

Executive summary

The tension: about 35 GW of power has been requested for data centres, while only 216 MW of IT capacity is live today. Plan on the baseline of about 1.1 GW, but buy options for the AI corridor; the moves that pay in every future sit upstream of the halls.

Demand is not the brake. Two cloud regions are live, Microsoft has pledged over USD 1 bn for 2026-2028 and pre-leasing rose ninefold in a year.

The grid is. Data centres have asked for about 35 GW, near the national peak; the regional utility can confirm only 18.7% of what it was asked for.

Report details

Published
2026-10-21
Pages
42
Format
PDF
Code
TH-DCT-XPL-D26-03
Market
Thailand
Industry
Data centers & cloud
Year
2026

Table of contents · 8 sections

  1. ES Executive summary
  2. 01 A small market that earns from power as much as space
  3. 02 Demand runs ahead, the grid sets the pace
  4. 03 Profit moves upstream to whoever holds power
  5. 04 Four futures to 2030, one decided by the grid
  6. 05 Robust moves now, bets on signposts
  7. 06 Who's who in Thai data centres
  8. Methodology and sources

The full report is available to subscribers and buyers. The executive summary above is free to read.

Key questions

Which scenario gives Thailand the most data-centre capacity by 2030?

The AI corridor scenario, where the grid is delivered and demand surges, reaches 1.6-1.9 GW of live IT capacity in 2030, according to KIRA's 2026 trends and outlook (Kira estimates).

Source: Kira estimates, 2030 · KIRA report: Thailand data centres 2026: trends and outlook

How much live data-centre capacity will Thailand have in 2030?

KIRA estimates live data-centre IT capacity in Thailand in 2030 at 0.6-1.9 GW across four futures, with the baseline at 1.0-1.2 GW, according to KIRA's 2026 trends and outlook (Kira estimates).

Source: Kira estimates, 2030 · KIRA report: Thailand data centres 2026: trends and outlook

How fast is Delta Electronics' data-centre revenue growing in Thailand?

Delta Electronics (Thailand) revenue rose 50.7% year on year in Q2 2026, reaching USD 2011 m that quarter, according to KIRA's 2026 trends and outlook [Delta Q2 2026].

Source: Delta Q2 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

How much data-centre capacity is in Thailand's pipeline?

Thailand has 944 MW of IT capacity under construction or planned, and BOI has approved 42 projects with 3,400 MW of IT load, according to KIRA's 2026 trends and outlook [BMI Jun 2026; Thairath Aug 2026].

Source: BMI Jun 2026; Thairath Aug 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

How much has industrial estate land price risen in Thailand?

The average industrial-estate land price reached THB 6.76 m per rai in Q1 2026, up from THB 5.26 m in Q1 2025, according to KIRA's 2026 trends and outlook [WHA Q1 2026].

Source: WHA Q1 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

Which investors are behind Thailand's BOI-approved data-centre projects?

Thai investors hold 15 of the 42 BOI-approved data-centre projects in 2024-2026 and Chinese investors hold 10, according to KIRA's 2026 trends and outlook [Thairath Aug 2026].

Source: Thairath Aug 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

How much colocation rent could Thai data-centre operators earn in 2030?

KIRA estimates Thailand's colocation rent pool at USD 1.2-1.8 bn a year in 2030 in the baseline, and USD 2-2.9 bn in the AI corridor scenario, according to KIRA's 2026 trends and outlook (Kira estimates).

Source: Kira estimates, 2030 · KIRA report: Thailand data centres 2026: trends and outlook

How much live data-centre IT capacity does Thailand have today?

Thailand had 216 MW of live data-centre IT capacity in Q2 2026, 145.8 MW of it in Bangkok, according to KIRA's 2026 trends and outlook [BMI Jun 2026].

Source: BMI Jun 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

How much data-centre power has been requested in Thailand?

Data centres have asked for about 35 GW of power in Thailand, near the national peak, against 8.8 GW planned for them, according to KIRA's 2026 trends and outlook [MoE Sep 2026].

Source: MoE Sep 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

How much live data-centre capacity is in Bangkok compared with the Eastern Economic Corridor?

Bangkok metro had 145.8 MW of live IT capacity in Q2 2026, against 70 MW in Chonburi (EEC), according to KIRA's 2026 trends and outlook [BMI Jun 2026].

Source: BMI Jun 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

What does one kW of IT load earn in Bangkok each month?

In Bangkok, colocation rent is about USD 135 per kW a month at the blended midpoint (range 120-150), while power at THB 3.89 to 6.00 per kWh adds USD 119-184, according to KIRA's 2026 trends and outlook (Kira estimates).

Source: Kira estimates, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

What electricity rate will Thai data centres pay?

The average Thai electricity tariff for September-December 2026 is THB 3.89 per kWh, and the proposed data-centre rate is THB 5-6 per kWh, according to KIRA's 2026 trends and outlook [ERC Aug 2026].

Source: ERC Aug 2026; Tariff Jun 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

When will PEA grid upgrades for data centres arrive?

PEA's grid upgrades for data-centre demand arrive only from 2028 to 2033, so supply stays rationed for years, according to KIRA's 2026 trends and outlook [PEA Jun 2026].

Source: PEA Jun 2026, 2028 · KIRA report: Thailand data centres 2026: trends and outlook

How much water do data-centre sites in the EEC need?

16 EEC data-centre sites need 42-50 million cubic metres of water a year, a limit in dry years, according to KIRA's 2026 trends and outlook [RID Sep 2026].

Source: RID Sep 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook

Which Thai data-centre operators are losing ground?

Small Thai operators are losing ground: PROEN's revenue fell 37% in Q2 2026 as data-centre clients used less, according to KIRA's 2026 trends and outlook [PROEN Q2 2026].

Source: PROEN Q2 2026, 2026 · KIRA report: Thailand data centres 2026: trends and outlook