Taiwan Offshore wind: key facts
Market size
How much new offshore wind build is needed in Taiwan to 2030?
New offshore wind build to 2030 is worth NT$1.0-1.3 trn, a KIRA estimate at NT$250-300 mn per MW, in KIRA's 2026 market overview.
Source: Kira estimates, 2030 · KIRA report: Taiwan offshore wind 2026: market overview
How much offshore wind capacity did Round 3.3 offer?
Round 3.3 opened on 1 April 2026 with at least 3.6 GW and a 1 GW cap per developer, per MOEA Mar 2026 in KIRA's 2026 market overview.
Source: MOEA Mar 2026, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
How much are Taiwan's offshore wind farms worth in power sales today?
Taiwan's offshore wind power sales are NT$45-55 bn a year today, a KIRA estimate from MOEA data in KIRA's 2026 market overview.
Source: MOEA Jun 2026; Kira estimates, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
Which stage takes the largest share of an offshore wind farm's capital cost?
Turbines take about 38% of a fixed-bottom farm's capital cost, with foundations at 17%, a KIRA split of NT$250-300 mn per MW in KIRA's 2026 market overview.
Source: Kira estimates, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
How big is Taiwan's offshore wind market today?
About 4.8 GW of offshore wind was installed in Taiwan by June 2026, according to MOEA Jun 2026 in KIRA's 2026 market overview.
Source: MOEA Jun 2026, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
Growth
What could Taiwan offshore wind look like in 2030 if the grid and supply open up?
In KIRA's open and on-time future, Taiwan reaches about 10.5 GW by 2030, close to the 10.9 GW target, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2030 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much offshore wind will Taiwan have by 2030?
About 4.8 GW was installed by June 2026, and awarded projects take Taiwan to 8.0-10.5 GW by 2030, a KIRA estimate against the 10.9 GW target, per KIRA's 2026 trends and outlook.
Source: Kira estimates; MOEA Jun 2026; Enerdata 2025, 2030 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much offshore wind capacity will Taiwan have by 2030?
KIRA's base case has about 9 GW of offshore wind in Taiwan by 2030, short of the official 10.9 GW target, per Enerdata 2025 and KIRA estimates in KIRA's 2026 market overview.
Source: Kira estimates; Enerdata 2025, 2030 · KIRA report: Taiwan offshore wind 2026: market overview
How fast is Taiwan's power demand planned to grow?
Taiwan's national power report 2026 plans demand growth of 2.5% a year over the next decade, up from 1.7% in the 2025 report, per MOEA power report 2026, according to KIRA's 2026 trends and outlook.
Source: MOEA power report 2026, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How fast has Taiwan's offshore wind capacity grown?
Taiwan's offshore wind capacity doubled from 2.25 GW at end-2023 to 4.8 GW by June 2026, per NRF 2024 and MOEA data in KIRA's 2026 market overview.
Source: NRF 2024, 2023 · KIRA report: Taiwan offshore wind 2026: market overview
Trends
How big are Taiwan's floating wind demonstration sites?
The floating demonstration plans two or three sites of about 100-200 MW each, with grid by end-2032, per the Energy Administration's Sep 2026 draft, cited by Reccessary Sep 2026, according to KIRA's 2026 trends and outlook.
Source: Reccessary Sep 2026, 2032 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What allocation in Round 3.3 would signal the strongest offshore wind future?
KIRA's signpost is more than 2 GW allocated in Round 3.3 by end-2026, which points to scenario A or B, per KIRA's thresholds with MOEA Mar 2026, according to KIRA's 2026 trends and outlook.
Source: Kira estimates; MOEA Mar 2026, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much Round 3.2 offshore wind capacity is still alive?
Round 3.2 shrank from 2.7 GW awarded to about 1.4 GW still alive by October 2026, per CNA 2026 in KIRA's 2026 trends and outlook, so execution now limits growth.
Source: CNA 2026, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How big are the turbines in Taiwan's recent offshore wind farms?
Recent Taiwan farms use turbines of 14-15 MW, such as Hai Long and Fengmiao 1, per CIP Mar 2025 and Windtech 2025 in KIRA's 2026 trends and outlook.
Source: CIP Mar 2025; Windtech 2025, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How long are corporate power contracts for Taiwan offshore wind?
TSMC signed a 30-year power contract for Hai Long in 2026, a term KIRA reads as corporate buyers setting the price, per Northland Apr 2026 in KIRA's 2026 trends and outlook.
Source: Northland Apr 2026, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much offshore wind capacity did Round 3.3 offer, and how many bidders applied?
Round 3.3 offered at least 3.6 GW but drew only two developer bids, per NOWnews Sep 2026 and MOEA Mar 2026 in KIRA's 2026 trends and outlook.
Source: NOWnews Sep 2026; MOEA Mar 2026, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much offshore wind capacity from Round 3.2 is still alive?
Round 3.2 shrank from 2.7 GW awarded to about 1.4 GW still alive by October 2026, per CNA 2026 in KIRA's 2026 market overview.
Source: CNA 2026, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
Key players
How much of Taiwan's built offshore wind do the top three sponsors hold?
Ørsted, CIP and Northland hold about 80% of built offshore wind capacity, a KIRA estimate in KIRA's 2026 market overview.
Source: Kira estimates, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
How many developer teams applied for Taiwan's Round 3.3?
Only two developer teams applied to Round 3.3 for its 3.6 GW, per NOWnews Sep 2026 in KIRA's 2026 market overview.
Source: NOWnews Sep 2026, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
Who leads Taiwan's built offshore wind capacity?
Ørsted leads with 1.82 GW built or nearly built, ahead of CIP at 1.39 GW and Northland at 1.02 GW, per Enerdata Sep 2026 in KIRA's 2026 market overview.
Source: Enerdata Sep 2026; Kira estimates, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
How much offshore wind is built or planned in Taiwan's Changhua zone?
Changhua holds about 4.0 GW of Taiwan's offshore wind farms built, building or awarded, per Taipower 2025 and KIRA estimates in KIRA's 2026 market overview.
Source: Taipower 2025; Kira estimates, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
Pricing
What contract price would offshore wind buyers pay if the build stalls?
In KIRA's stalled-build future, contract prices rise to NT$5.5 or more per kWh and 2030 capacity falls to 7.5-8.5 GW, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2030 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What contract price would offshore wind buyers pay in an open-supply future?
In KIRA's open and on-time future, contract prices ease to NT$4.0-4.5 per kWh, and lead developers and foreign suppliers win, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2030 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What is the purchase floor for Round 3.3 offshore wind?
Round 3.3 adds a NT$2.29 per kWh purchase floor, per MOEA Mar 2026 in KIRA's 2026 trends and outlook.
Source: MOEA Mar 2026, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What is the purchase floor for Taiwan's Round 3.3 offshore wind auction?
Round 3.3 adds only a NT$2.29 per kWh purchase floor, per MOEA Mar 2026 in KIRA's 2026 market overview.
Source: MOEA Mar 2026, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
What price did Round 3.1 corporate buyers pay for offshore wind power?
Round 3.1 corporate buyers signed at NT$5.0-5.5 per kWh, per Mirror Media 2024 in KIRA's 2026 trends and outlook.
Source: Mirror Media 2024, 2024 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What price did Round 3.1 corporate contracts set for Taiwan offshore wind?
Round 3.1 corporate contracts were priced at a mid-point of NT$5.25 per kWh, per Mirror Media 2024 in KIRA's 2026 market overview.
Source: Mirror Media 2024, 2024 · KIRA report: Taiwan offshore wind 2026: market overview
Trade flows
How much equipment do EU exporters ship to Taiwan for wind power?
EU exports of generating sets to Taiwan reached EUR 390.1 mn in 2025, under HS 8502, per Eurostat 2026 in KIRA's 2026 trends and outlook.
Source: Eurostat 2026, 2025 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much equipment do EU exporters ship to Taiwan for wind power?
EU exports of generating sets to Taiwan reached EUR 390.1 mn in 2025, under HS 8502 which includes wind-powered sets, per Eurostat 2026 in KIRA's 2026 market overview.
Source: Eurostat 2026, 2025 · KIRA report: Taiwan offshore wind 2026: market overview
Regulation
What does Round 3.3 need to pass in its selection score?
Round 3.3 needs 70 points out of 100 to pass, with 35 for developer record, 30 for financial capacity and 35 for project execution, per MOEA Mar 2026, according to KIRA's 2026 trends and outlook.
Source: MOEA Mar 2026, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What does Round 3.3 need to pass in its selection score?
Round 3.3 needs 70 points out of 100 to qualify, with 35 for developer record, 30 for financial capacity and 35 for project execution, per MOEA Mar 2026, according to KIRA's 2026 market overview.
Source: MOEA Mar 2026, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
Market entry
How much equity would a foreign company put into a Taiwan offshore wind stake?
KIRA's second horizon is a 20-30% stake in a 500 MW farm for US$200-350 mn of equity in 2027-2029, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2029 · KIRA report: Taiwan offshore wind 2026: trends and outlook
When should a foreign company decide on a lead bid for Taiwan offshore wind?
KIRA's gate for a lead bid on Round 3.4 needs workable rules and dated grid points, with the decision due in 2027, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2027 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What is the budget for the first horizon of a Taiwan offshore wind entry?
KIRA's first horizon, position in 2026-2027, budgets US$3-10 mn for supply bids and a stake term sheet, per KIRA's 2026 market overview.
Source: Kira estimates, 2027 · KIRA report: Taiwan offshore wind 2026: market overview
Which offshore wind stake should a Japanese or Korean company buy in Taiwan?
Buying a 20-30% stake in a financed or operating farm is a robust, do-now move for a Japanese or Korean company, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2026 · KIRA report: Taiwan offshore wind 2026: trends and outlook
Which offshore wind entry move suits a Japanese or Korean company now?
Buying a 10-30% stake in a financed farm is rated a strong, do-now move for a Japanese or Korean company, per KIRA's 2026 market overview.
Source: Kira estimates, 2026 · KIRA report: Taiwan offshore wind 2026: market overview
Investment
How much debt does Fengmiao 1 carry?
Fengmiao 1 carries NT$103 bn of debt for 495 MW, per CIP Mar 2025 in KIRA's 2026 trends and outlook.
Source: CIP Mar 2025, 2025 · KIRA report: Taiwan offshore wind 2026: trends and outlook
Risks
Will Taiwan's floating offshore wind pilots arrive on time?
Floating pilots slipping again beyond 2033 is KIRA's counter-case to its floating trend, rated high likelihood, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2033 · KIRA report: Taiwan offshore wind 2026: trends and outlook
What is the main delivery risk for a foreign offshore wind entrant in Taiwan?
A grid connection slipping a year or more is rated high likelihood and high impact for a foreign entrant, so KIRA suggests pricing the delay into bids, per KIRA's 2026 trends and outlook.
Source: Kira estimates, 2030 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much grid capacity does Taiwan's offshore phase 1 connect, and when?
The phase 1 offshore grid connects 7.64 GW by end-2027, and 1.5 GW a year is needed after that, per Taipower 2025 in KIRA's 2026 trends and outlook.
Source: Taipower 2025, 2027 · KIRA report: Taiwan offshore wind 2026: trends and outlook
How much grid capacity will Taiwan's offshore phase 1 connect?
Phase 1 of the offshore grid connects 7.64 GW with works due by December 2027, and about 1.5 GW a year is needed from 2026, per Taipower 2025, according to KIRA's 2026 market overview.
Source: Taipower 2025, 2027 · KIRA report: Taiwan offshore wind 2026: market overview
How much offshore wind capacity was cancelled in Taiwan?
600 MW of Round 3.2 was cancelled in 2025 and Youde's 700 MW is being terminated, per CTEE May 2025 and CNA 2026 in KIRA's 2026 market overview.
Source: CTEE May 2025; CNA 2026, 2025 · KIRA report: Taiwan offshore wind 2026: market overview
Other questions
How many Taiwan-flagged vessels serve the offshore wind sector?
About 120 Taiwan-flagged vessels serve the sector, while 1.5-2 GW a year needs two to three installation fleets, per Focus Taiwan Aug 2026 in KIRA's 2026 market overview.
Source: Focus Taiwan Aug 2026, 2026 · KIRA report: Taiwan offshore wind 2026: market overview