VIETNAM · DATA CENTER · MARKET ANALYSIS

Vietnam's data center landing test — capacity, power and the 2027 squeeze

Vietnam's data center market reached USD 1.04 bn in 2025 with installed capacity near 525 MW, on a path toward ~950 MW by 2030 at a 12.6% CAGR [DC Outlook 2025]. Yet only about 60 MW is live across the HCMC and Hanoi clusters against a 500+ MW announced pipeline [VnEconomy 2025]. Power supply and grid transmission, not demand, set the pace at which hyperscale capacity actually lands [MOIT 2025].

Executive summary

Vietnam's data centre market is entering a high-growth phase, with installed IT power capacity projected to reach 600–700 MW by 2027 from approximately 350 MW in 2025. Microsoft, Google, and AWS have each announced Vietnam market commitments, with data sovereignty regulations under Decree 13/2023 requiring local data storage for specific categories of citizen data. The market is currently dominated by domestic operators Viettel IDC and VNPT-Net, alongside regional players ST Telemedia and Equinix. Hanoi and Ho Chi Minh City account for over 90% of capacity, but power grid constraints in the South are creating bottlenecks requiring renewable energy investment. This report covers Vietnam's data centre market size and capacity pipeline, operator competitive landscape, power infrastructure constraints, regulatory data localisation requirements, hyperscaler demand drivers, and investment outlook through 2027.

Report details

Published
2026-06-03
Pages
17
Format
PDF
Code
VN-DCT-XPL-D27-01
Market
Vietnam
Industry
Data Center
Year
2026

Table of contents · 10 sections

  1. 03 Executive summary
  2. 03 Strategic implications
  3. 04 Market sizing & trajectory
  4. 04 Demand drivers
  5. 05 Power & the grid
  6. 05 The operational gap
  7. 05 Connectivity & regulation
  8. 06 Competitive structure
  9. 07 2027 outlook & scenarios
  10. 07 Methodology & sources

The full report is available to subscribers and buyers. The executive summary above is free to read.

Key questions

How fast will Vietnam's data center capacity grow to 2030?

Capacity is on a path toward about 950 MW by 2030 at a 12.6% CAGR, a forecast according to KIRA's 2026 market report (DC Outlook 2025).

Source: DC Outlook 2025, 2030 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

How fast is national power demand growing in Vietnam?

National power demand is set to grow 10.3-12.5% a year through 2030, according to KIRA's 2026 market report (MOIT 2025).

Source: MOIT 2025, 2030 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

What large data center projects are being built in Ho Chi Minh City?

Viettel IDC's Tan Phu Trung build is 140 MW, alongside a USD 2 bn G42-Microsoft-FPT campus, according to KIRA's 2026 market report (Cafef 2025).

Source: Cafef 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

How big is the announced data center pipeline in Ho Chi Minh City?

Announced and under-construction projects in Ho Chi Minh City exceed 500 MW, according to KIRA's 2026 market report (DCD 2026).

Source: DCD 2026, 2026 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

How much data center capacity is live in Vietnam?

About 525 MW of data center capacity was installed in Vietnam in 2025, according to KIRA's 2026 market report (DC Outlook 2025).

Source: DC Outlook 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

How big is the data center market in Vietnam?

Vietnam's data center market reached about USD 1.04 bn in 2025, according to KIRA's 2026 market report (Arizton 2025).

Source: Arizton 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

How much subsea cable capacity does Vietnam have?

The Asia Direct Cable went live in 2025 with more capacity than Vietnam's five prior systems combined, and 10 more cables are targeted by 2030, according to KIRA's 2026 market report (VietnamPlus 2025).

Source: VietnamPlus 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

How much data center load is live in Hanoi and Ho Chi Minh City?

Operational load across Hanoi and HCMC was only about 60 MW in 2025, against a pipeline of 500+ MW, according to KIRA's 2026 market report (VnEconomy 2025).

Source: VnEconomy 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

Do data residency rules in Vietnam create demand for local data centers?

The Personal Data Protection Law (effective January 2026) and its data-residency decree force in-country storage, a demand floor for colocation through 2027, according to KIRA's 2026 market report (FPF 2025).

Source: FPF 2025, 2026 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

Can data center operators in Vietnam buy clean power directly?

A 2025 decree reopened direct power purchase agreements, including a private-wire arrangement for campuses near generation, according to KIRA's 2026 market report (IEEFA 2025).

Source: IEEFA 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

What limits how fast data center capacity lands in Vietnam?

Grid transmission and clean-power access, not demand, set the pace at which hyperscale capacity lands in Vietnam, according to KIRA's 2026 market report (MOIT 2025).

Source: MOIT 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

What is the 2027 outlook for Vietnam's data centers?

KIRA's 2027 scenarios for Vietnam's data centers (base, accelerated, constrained) hinge on whether grid headroom and clean power arrive in time (KIRA estimates), according to KIRA's 2026 market report.

Source: Kira estimates, 2027 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze

More on Data centres in Vietnam