Key questions
How fast will Vietnam's data center capacity grow to 2030?
Capacity is on a path toward about 950 MW by 2030 at a 12.6% CAGR, a forecast according to KIRA's 2026 market report (DC Outlook 2025).
Source: DC Outlook 2025, 2030 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How fast is national power demand growing in Vietnam?
National power demand is set to grow 10.3-12.5% a year through 2030, according to KIRA's 2026 market report (MOIT 2025).
Source: MOIT 2025, 2030 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
What large data center projects are being built in Ho Chi Minh City?
Viettel IDC's Tan Phu Trung build is 140 MW, alongside a USD 2 bn G42-Microsoft-FPT campus, according to KIRA's 2026 market report (Cafef 2025).
Source: Cafef 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How big is the announced data center pipeline in Ho Chi Minh City?
Announced and under-construction projects in Ho Chi Minh City exceed 500 MW, according to KIRA's 2026 market report (DCD 2026).
Source: DCD 2026, 2026 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How much data center capacity is live in Vietnam?
About 525 MW of data center capacity was installed in Vietnam in 2025, according to KIRA's 2026 market report (DC Outlook 2025).
Source: DC Outlook 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How big is the data center market in Vietnam?
Vietnam's data center market reached about USD 1.04 bn in 2025, according to KIRA's 2026 market report (Arizton 2025).
Source: Arizton 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How much subsea cable capacity does Vietnam have?
The Asia Direct Cable went live in 2025 with more capacity than Vietnam's five prior systems combined, and 10 more cables are targeted by 2030, according to KIRA's 2026 market report (VietnamPlus 2025).
Source: VietnamPlus 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How much data center load is live in Hanoi and Ho Chi Minh City?
Operational load across Hanoi and HCMC was only about 60 MW in 2025, against a pipeline of 500+ MW, according to KIRA's 2026 market report (VnEconomy 2025).
Source: VnEconomy 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
Do data residency rules in Vietnam create demand for local data centers?
The Personal Data Protection Law (effective January 2026) and its data-residency decree force in-country storage, a demand floor for colocation through 2027, according to KIRA's 2026 market report (FPF 2025).
Source: FPF 2025, 2026 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
Can data center operators in Vietnam buy clean power directly?
A 2025 decree reopened direct power purchase agreements, including a private-wire arrangement for campuses near generation, according to KIRA's 2026 market report (IEEFA 2025).
Source: IEEFA 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
What limits how fast data center capacity lands in Vietnam?
Grid transmission and clean-power access, not demand, set the pace at which hyperscale capacity lands in Vietnam, according to KIRA's 2026 market report (MOIT 2025).
Source: MOIT 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
What is the 2027 outlook for Vietnam's data centers?
KIRA's 2027 scenarios for Vietnam's data centers (base, accelerated, constrained) hinge on whether grid headroom and clean power arrive in time (KIRA estimates), according to KIRA's 2026 market report.