Vietnam Data centres: key facts
Market size
How big is the annual rent pool for Vietnam's data centres in 2030?
KIRA estimates the baseline annual rent pool for Vietnamese data centres at USD 576-720 million in 2030.
Source: Kira estimates, 2030 · KIRA report: Vietnam data centres 2026: trends and outlook
How much live data-centre capacity could Vietnam have by 2030 in the baseline?
KIRA's baseline puts Vietnam's live data-centre IT capacity at 400-500 MW by 2030, about four times today (KIRA estimates).
Source: Kira estimates, 2030 · KIRA report: Vietnam data centres 2026: trends and outlook
How big is the announced data center pipeline in Ho Chi Minh City?
Announced and under-construction projects in Ho Chi Minh City exceed 500 MW, according to KIRA's 2026 market report (DCD 2026).
Source: DCD 2026, 2026 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How much named AI-ready data-centre capacity is at each stage in Vietnam?
Named projects hold 206 MW under construction, 240 MW approved or with land secured, and 550 MW at MoU or proposal stage (KIRA 2026 trends and outlook, from CBRE Nov 2025).
Source: CBRE Nov 2025, 2026 · KIRA report: Vietnam data centres 2026: trends and outlook
How much data center capacity is live in Vietnam?
About 525 MW of data center capacity was installed in Vietnam in 2025, according to KIRA's 2026 market report (DC Outlook 2025).
Source: DC Outlook 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How much subsea cable capacity does Vietnam have?
The Asia Direct Cable went live in 2025 with more capacity than Vietnam's five prior systems combined, and 10 more cables are targeted by 2030, according to KIRA's 2026 market report (VietnamPlus 2025).
Source: VietnamPlus 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How much data center load is live in Hanoi and Ho Chi Minh City?
Operational load across Hanoi and HCMC was only about 60 MW in 2025, against a pipeline of 500+ MW, according to KIRA's 2026 market report (VnEconomy 2025).
Source: VnEconomy 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How big is the data center market in Vietnam?
Vietnam's data center market reached about USD 1.04 bn in 2025, according to KIRA's 2026 market report (Arizton 2025).
Source: Arizton 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
Where is Vietnam's live data-centre capacity located?
81% of Vietnam's live data-centre capacity sits in Hanoi and Ho Chi Minh City (KIRA 2026 trends and outlook, from CBRE Nov 2025).
Source: CBRE Nov 2025, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
How big is Vietnam's data-centre market in 2025?
Vietnam had 104 MW of live data-centre IT capacity in October 2025, the smallest base among the region's larger markets (KIRA 2026 trends and outlook, from CBRE Nov 2025).
Source: CBRE Nov 2025, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
Growth
How fast is national power demand growing in Vietnam?
National power demand is set to grow 10.3-12.5% a year through 2030, according to KIRA's 2026 market report (MOIT 2025).
Source: MOIT 2025, 2030 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
How fast will Vietnam's data center capacity grow to 2030?
Capacity is on a path toward about 950 MW by 2030 at a 12.6% CAGR, a forecast according to KIRA's 2026 market report (DC Outlook 2025).
Source: DC Outlook 2025, 2030 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
What is the high-growth scenario for Vietnam's data-centre capacity by 2030?
KIRA's sovereign AI corridor scenario reaches 750-900 MW of live capacity by 2030, the highest of its four futures (KIRA estimates).
Source: Kira estimates, 2030 · KIRA report: Vietnam data centres 2026: trends and outlook
What is the low-growth scenario for Vietnam's data-centre capacity by 2030?
KIRA's slow-lane scenario has 200-280 MW of live capacity by 2030, if power stays rationed and demand cools (KIRA estimates).
Source: Kira estimates, 2030 · KIRA report: Vietnam data centres 2026: trends and outlook
How fast is Vietnam's digital economy growing?
Vietnam's digital economy grew 17% to USD 39 billion in 2025, which keeps demand for data centres rising (KIRA 2026 trends and outlook, from e-Conomy 2025).
Source: e-Conomy 2025, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
Trends
Which data-centre trend has the highest impact in Vietnam?
KIRA rates grid and green-power access as the highest-impact data-centre trend, at 5 out of 5 for impact, with a pace of 2 (KIRA estimates, to 2030).
Source: Kira estimates, 2030 · KIRA report: Vietnam data centres 2026: trends and outlook
Which data-centre trend is moving fastest in Vietnam?
KIRA rates the power tariff reclassification as the fastest-moving data-centre trend, at pace 5 out of 5 with impact 4.4 (KIRA estimates, to 2030).
Source: Kira estimates, 2030 · KIRA report: Vietnam data centres 2026: trends and outlook
What is the 2027 outlook for Vietnam's data centers?
KIRA's 2027 scenarios for Vietnam's data centers (base, accelerated, constrained) hinge on whether grid headroom and clean power arrive in time (KIRA estimates), according to KIRA's 2026 market report.
Source: Kira estimates, 2027 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
What live capacity in Vietnam would signal which data-centre scenario is playing out?
Live IT capacity above 250 MW by end-2027 points to the AI corridor or baseline scenario, while below 170 MW points to the slow lane (KIRA estimates).
Source: Kira estimates, 2027 · KIRA report: Vietnam data centres 2026: trends and outlook
Key players
What large data center projects are being built in Ho Chi Minh City?
Viettel IDC's Tan Phu Trung build is 140 MW, alongside a USD 2 bn G42-Microsoft-FPT campus, according to KIRA's 2026 market report (Cafef 2025).
Source: Cafef 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
Which operator holds the most live data-centre capacity in Vietnam?
Viettel IDC holds 42 MW of live IT capacity in Vietnam, and VNPT holds 25 MW, as of October 2025 (KIRA 2026 trends and outlook, from CBRE Nov 2025).
Source: CBRE Nov 2025, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
Pricing
What does a kW of data-centre capacity earn and cost each month in Vietnam?
A 42U rack at 5 kW lists at about USD 193 per kW a month, while power at the business tariff costs about USD 139 per kW a month (KIRA estimates, from rack listing 2025).
Source: Rack listing 2025; Kira estimates, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
Margins
How much have data-centre electricity bills risen in Vietnam?
Data centres were moved to the business electricity tariff, lifting their bills by more than 50% (KIRA 2026 trends and outlook, from TechNode Sep 2026).
Source: TechNode Sep 2026, 2026 · KIRA report: Vietnam data centres 2026: trends and outlook
What does a data centre cost to build per MW in Vietnam?
Building a data centre in Vietnam costs about USD 7.1 million per MW, and AI fit-out lifts that cost (KIRA 2026 trends and outlook, from Cushman Jul 2025).
Source: Cushman Jul 2025, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
Trade flows
How big are Vietnam's server exports to the EU?
EU imports of computers and servers from Vietnam reached EUR 4.42 billion in 2025, up from EUR 1.21 billion in 2020 (KIRA 2026 trends and outlook, from Eurostat 2025).
Source: Eurostat 2025, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
Regulation
When will Vietnam's data-centre power tariff be settled?
KIRA's signpost is a final data-centre tariff rule that puts technical load at the industrial rate, expected by Q2 2027 (KIRA estimates).
Source: Kira estimates, 2027 · KIRA report: Vietnam data centres 2026: trends and outlook
Do data residency rules in Vietnam create demand for local data centers?
The Personal Data Protection Law (effective January 2026) and its data-residency decree force in-country storage, a demand floor for colocation through 2027, according to KIRA's 2026 market report (FPF 2025).
Source: FPF 2025, 2026 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
Can data center operators in Vietnam buy clean power directly?
A 2025 decree reopened direct power purchase agreements, including a private-wire arrangement for campuses near generation, according to KIRA's 2026 market report (IEEFA 2025).
Source: IEEFA 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze
Can a foreign company own a data centre in Vietnam?
Vietnam's Telecom Law, in force since 1 January 2025, allows up to 100% foreign ownership of data-centre and cloud businesses (KIRA 2026 trends and outlook, from Telecom Law 2023).
Source: Telecom Law 2023, 2025 · KIRA report: Vietnam data centres 2026: trends and outlook
Market entry
How much would a foreign investor need to commit to an AI-ready data-centre option in Ho Chi Minh City?
KIRA's G2 capacity option for a 20-30 MW AI-ready phase with a partner in Ho Chi Minh City costs USD 140-240 million, gated on the grid date (KIRA estimates).
Source: Kira estimates, 2027 · KIRA report: Vietnam data centres 2026: trends and outlook
Investment
How much has G42 committed to Vietnamese AI and cloud sites?
G42 backs three Vietnamese AI and cloud sites with up to USD 1 billion of consumption commitments (KIRA 2026 trends and outlook, from G42 Feb 2026).
Source: G42 Feb 2026, 2026 · KIRA report: Vietnam data centres 2026: trends and outlook
Risks
What limits how fast data center capacity lands in Vietnam?
Grid transmission and clean-power access, not demand, set the pace at which hyperscale capacity lands in Vietnam, according to KIRA's 2026 market report (MOIT 2025).
Source: MOIT 2025, 2025 · KIRA report: Vietnam's data center landing test — capacity, power and the 2027 squeeze