Market entry · Expert interview

How a Malaysian township developer decides whether a new wall or ceiling system makes it into the show unit

Format
Modelled interview
As of
October 2026
Market
Malaysia
Industry
Building materials (interior wall and ceiling systems)
Length
≈ 30 min read
CIDBRehdaNAPICDepartment of Statistics MalaysiaMinistry of Housing and Local GovernmentFire and Rescue Department (Bomba)
Modelled interview. Built from KIRA's face-to-face interviews with housing developers, architects, contractors and installers, dealers and distributors, and homeowners across the Klang Valley, Penang and Johor, set in today's market. How the trade works comes from what those people told our analysts; every figure comes from a 2024–2026 source, marked next to the answer.

Summary

  • The show unit is the specification: a developer delivers what the show unit displays, and its in-house design team, not the consulting architect, writes the materials brief. 1 2
  • Developers copy what sells, so ceilings and finishes get trialled long before walls, and the launch market is cautious: 9,112 homes launched and 1,052 sold in the first quarter of 2026. 3 4
  • Brand is often decided below the developer: 'or equivalent' wording, a contractor's cheaper counter-offer and the sub-contractor who buys the boards. 5 6
  • Costs are climbing, with Rehda reporting an average 13% rise between March and June 2026, while the foreign-labour target of a 10% annual cut makes dry methods more interesting. 7 8
  • Approvals work through the IBS Score: 70 for large private projects at building plan stage, a separate 50 for the housing levy exemption, and wall systems worth up to 20 of the 100 points. 9 10
  • Entry path: a reference project that already works, a ceiling or finish trial before a wall, crews trained on site, and a total installed cost that beats the incumbent. 11 3 12 13

Transcript

01The show unit is the specification

KAKIRA Analyst

Thanks for making time. A supplier tells you they have a better wall system. What has to happen before it shows up in one of your show units?

EXExpert

First, the thing outsiders get wrong: they go and charm the consulting architect. But the architect we hire from outside gets a brief from us, and that brief does not carry material specs. 1 The specs come from my own team in-house, and then marketing and the general manager approve them. 1

And this is the bit that decides everything. We deliver exactly what the show unit displays. 2 So if your wall or ceiling system is not in the show unit on launch day, it is not going into the houses either. There is no 'we'll slip it in later'. For us the show unit is the specification. 2 I have watched suppliers spend a year talking to consultants and then discover the decision was made in a room they were never invited to. 1

KAKIRA Analyst

That makes the show unit very expensive to get wrong. How cautious does that make you?

EXExpert

Very, and the market is not forgiving at the moment. In the first quarter of 2026 developers launched 9,112 homes and sold 1,052, which is a sales rate of 11.5%. In the same quarter a year earlier, 12,498 were launched. 4

Nobody in my building wants to be the person who put an experiment in the show unit and then watched the launch go quiet, so we copy what sells, we avoid structural material risk, and we play with finishes and ceilings far more readily than with walls. Walls stay brick until buyers ask for something else. 3 The up-market teams are braver than the mass-market ones. 14 But even there my director's first question is the same: show me a project where it already works. Not a brochure, a building. 11 I can't speak for other developers' meetings, but that is how it goes in mine. 11

02Who has a say besides the developer

KAKIRA Analyst

Walk me through the people. Apart from your design team, who influences the choice?

EXExpert

Marketing and the general manager sign off, as I said. 1 Marketing's question is the one we all ask: does this help the sale or hurt it? Developers copy what sells. 3 The consulting architect, when they do write a spec, very often writes a brand 'or equivalent'. Then the contractor comes back with a cheaper brand of what he calls equivalent quality, and the architect usually accepts. 5

My quantity surveyor lines the options up on installed cost per square metre, and I am not going to pretend that is a small voice in the room, because when the market is soft the cheapest total installed cost wins. 13 So I control the show unit and the written spec; below that it is the contractor's price. The one who actually buys the boards is usually the partition and ceiling sub-contractor, not the main contractor, and he buys on credit or cash, so the credit terms he gets are part of why he picks one brand over another. 6 A supplier who only courts me is doing only the first part of the job. 5 6

KAKIRA Analyst

What stops a main contractor from simply switching to a new wall system if you ask, and what about the installers?

EXExpert

His trades. Main contractors keep long-standing sub-contractors, and a different wall system means finding new people and more coordination on site. 15 I have seen a decent product turned down for exactly that reason, nothing to do with the product at all. 15 The contractor's foreman knows his old crew, knows how they work and when they turn up, and a new system means a new crew he has not met. That is a real cost to him even if it never appears in a quotation. 15

Then the installers. There is no formal installer training here. They learn on site from the contractor, and when the workmanship is poor it is the product that gets the bad name. 12 The board is fine; it's the fitting people don't trust. If I were a supplier I would train the crews myself, on my own cost, before the show unit goes up. 12

03Cost, time and labour in a tight year

KAKIRA Analyst

How is cost pressure showing up on your side right now, and does a faster wall win?

EXExpert

Badly. Rehda's latest survey found construction costs up an average of 13% between March and June, put down to fuel prices and geopolitical tensions, and 63% of developers cited difficulties with building materials and labour in the first half. 7 On the other side, 72% of developers reported financing issues in the second half of 2025, and 60% had unsold completed homes at the end of that year. 16

So a faster wall only wins if it is not dearer, because when the market is down, total installed cost is the decisive criterion. 13 Speed is worth real money to us, though. The sale and purchase agreement gives us 24 months to hand over a landed home and 36 for strata, and late delivery costs 10% a year of the purchase price. 17 A fixed deadline with penalties makes speed valuable, and suppliers should price their story that way. 18

KAKIRA Analyst

What about labour? Your contractors always complain about it. And is there still enough building going on to buy these materials?

EXExpert

They do complain. The head of CIDB said construction employs about 600,000 foreign workers and that the government wants a 10% cut every year under the 13th Malaysia Plan, with technology filling the gap. 8 For years cheap foreign labour was the reason nobody bothered with dry methods; why change when the wet trades were cheap? 19 I will believe the target when I see it in my site numbers, and until then I plan for both worlds. 8 19

As for volume, construction work done reached RM47.8 billion in the second quarter of this year, up 8.8%, and residential buildings were RM10.9 billion of that, a 22.8% share, up 8.7%. 20 So there is still plenty of work on site, even if new launches sell slowly. 20

04IBS, the CIDB levy and approvals

KAKIRA Analyst

IBS comes up in every supplier meeting. What actually applies to you?

EXExpert

Two different rules, and people mix them up. First, building plan approval. A private project with a development cost of RM50 million or more and a gross floor area of 50,000 square metres or more has to reach an IBS Score of 70, confirmed through CIDB's compliance system, before the plan is approved through the one-stop centre, OSC 3.0 Plus Online. 9 Whether a township phase triggers it depends on its development cost and floor area. 9

The circular behind that took effect on 10 July 2024, Circular 4/2024, and raised the score from 50 to 70. But approvals still sit with each local council, and not every council has adopted a mandatory minimum yet. 21 So we plan as if the 70 applies unless the council clearly says otherwise. Check with your own consultant, though; I am not the person to give you legal comfort. 21

The second rule is the levy. CIDB charges 0.125% of contract value on projects above RM500,000. 22 A housing project can apply for exemption if it reaches an IBS Score of 50, but you apply before it reaches 40% structural progress, you pay the levy first, and you only get the refund after completion if it is approved. 9 Different number, different purpose from the 70, and that trips people up. 9

KAKIRA Analyst

Where do wall systems sit in that score, and does IBS push developers towards dry walls? What about fire?

EXExpert

The score is out of 100 points: up to 50 for the structural system, up to 20 for wall systems, up to 30 for other simplified construction solutions. 10 So walls matter, but they are the smaller part. I won't quote you the factor for any particular wall type from memory; CIDB revises its tables, so ask them for the current factor for your exact system. 10 And it nudges, it doesn't push: developers told the press that IBS costs about 5% to 15% more than traditional methods. 21 If a dry wall saves labour but costs more per square metre installed, I still have to explain it to my general manager. 13

Fire is the other hurdle. In homes we lean on brick party walls to separate units, and the fire department, Bomba, is strict on non-residential buildings but light on home renovation. 23 So a fire-rated system gets a different conversation depending on whether I am building flats or shops. Also, public projects require local materials, which matters if you import. 24

05What a supplier must bring to win a trial

KAKIRA Analyst

Suppose I am a Japanese or Korean maker with a drywall system. What would you want to see before agreeing to a trial?

EXExpert

Evidence that it survives here. Show houses, live demonstrations and reference projects in a similar climate do more than any presentation. 25 And our designers copy Singapore, so a Singapore project carries weight. 25 Then a pilot where the risk is small: a ceiling or a finish first, not the walls of a whole phase. 3

The architects I work with ask about climate before they ask about price. Moisture and mould, acoustics, what happens when the owner hangs a heavy shelf, and termites, in a hot, humid country. 26 They also fear a board wall looks cheap and drags resale value down against brick. 26 Answer those four things on paper and bring the photos of a wall that has been through a wet season. 25

KAKIRA Analyst

And the buyers themselves, and where is the best first use?

EXExpert

Brick says solid and safe. The word 'board' says weak. Knock on a hollow wall in the show unit and the buyer's face changes. 27 So I would not sell it as a board at all; I would name what it does, say the acoustic partition or the fire-rated wall, and let the ceiling carry the board. 27

Board is used mostly for ceilings, partitions in big rooms and renovation work today. 28 In ceilings the real rival is plasterglass, which has been the cheaper option and is supplied by many small firms. 28 If you cannot beat it on installed cost, the developer will not move, however good your board is. 13

06Which buyers, which projects

KAKIRA Analyst

Which buyers would accept a lightweight internal wall, and does the unsold stock change how you think about high-rise versus landed?

EXExpert

The likely early adopters are younger, better travelled, better educated, people who redecorate often and do not hang much on the wall. 29 The mass of buyers want a complete layout from us. Open-concept, where you choose your own partitions, sounds clever in a brochure and is too much hassle for most families. 30

The unsold stock makes us careful. Unsold completed units reached 32,801, worth RM16.37 billion, and the pile is mostly condominiums and serviced apartments, now reaching suburban condos in Johor and the high-rise belt on Penang Island. 31 Landed homes were 61.1% of launches in the first quarter against 38.9% for high-rise. 4 Whether a lighter wall system is a selling point in a condo or just one more risk, I honestly cannot tell you yet. 31

07Advice, and what would change my mind

KAKIRA Analyst

If a new entrant asked you for a plan, what would it be?

EXExpert

One: bring a reference project that already works, ideally in this climate. 11 Two: start with ceilings or a finish in one phase, not the walls of everything. 3 Three: go through the sub-contractor and the dealer who actually buys the board, and train their crews, because the product's name is on the line each time a joint cracks. 6 12 Four: get the IBS paperwork straight with CIDB before you walk into my office, because it affects my plan approval and my levy. 9

And price it on total installed cost per square metre, with the contractor's own labour in it, not on the cost of the board. If you win that sum, I will listen. 13

KAKIRA Analyst

What would change your mind about all this, and what worries you?

EXExpert

Two things would move me. If more local councils enforce the IBS Score of 70 strictly, brick stops being the easy choice. 21 And if the labour cut becomes real on site, not just in a plan, the old reason for staying with wet trades disappears. 8 19

What worries me is the other direction: launches selling at 11.5% make everyone conservative, and a conservative developer repeats last year's show unit. 4 3

KAKIRA Analyst

Last question. Easy market or hard market for a new wall system?

EXExpert

Hard, and slow. The decision is made inside the developer and then rewritten by the contractor's price, so you have to win twice, once in my design studio and once at the sub-contractor's counter. 1 5 6 But the cost and labour pressure is real, and the supplier who shows up with a working project, a trained crew and a lower installed cost will get a trial. 7 11 12 13

Sources and basis

  1. 1
    At developers, material specifications are set by the in-house architecture and design team and approved by marketing and the general manager; the consulting architect receives a brief without material specifications
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  2. 2
    Developers deliver exactly what the show unit displays, so a new material has to appear in the show unit from the start
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  3. 3
    Developers copy what sells and avoid structural material risk for fear of hurting sales; they experiment more with finishes and ceilings than with walls, and walls stay brick until buyers ask for something else
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  4. 4
    Developers launched 9,112 residential units in Q1 2026 and sold 1,052, a sales rate of 11.5%; launch volume was lower than the 12,498 units in Q1 2025; landed homes were 61.1% of launches and high-rise 38.9%
    Public source · NAPIC figures reported by IQI Global, 2026 · link
  5. 5
    Architects often specify a brand 'or equivalent'; contractors routinely counter-propose cheaper brands of equivalent quality and architects usually accept
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  6. 6
    Most board purchasing is done by the partition and ceiling sub-contractor rather than the main contractor, on credit or cash, and credit terms feature in brand choice
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  7. 7
    Rehda survey: construction costs rose an average of 13% between March and June 2026, attributed to rising fuel prices and geopolitical tensions; 63% of developers cited difficulties with building materials and labour in the first half of 2026
    Public source · Malay Mail via Newswav, 23 Sep 2026 · link
  8. 8
    The CIDB chief executive said the construction sector employs about 600,000 foreign workers and the government targets a 10% annual reduction under the 13th Malaysia Plan; Bernama's headline: technology is crucial to address the foreign labour reduction
    Public source · Bernama, 2 Sep 2026 · link
  9. 9
    Private projects with a development cost of RM50 million or more and a gross floor area of 50,000 square metres or more must reach an IBS Score of 70, confirmed through the IBS Score Compliance System, before building plan approval via OSC 3.0 Plus Online; for government projects the threshold is RM10 million. Levy exemption is only for housing projects with a minimum IBS Score of 50, applied for before the project reaches 40% structural progress; the levy is paid first and refunded if approved after completion. The OSC requirement of 70 points is separate from the levy exemption of 50 points
    Public source · CIDB IBS portal (cidbibs.com.my), FAQ on IBS Score confirmation and levy exemption, accessed Oct 2026 · link
  10. 10
    The IBS Score totals 100 points: Part 1 structural systems up to 50 points, Part 2 wall systems up to 20 points, Part 3 other simplified construction solutions up to 30 points
    Public source · CIDB IBS portal (cidbibs.com.my), IBS Score page, accessed Oct 2026 · link
  11. 11
    Developers ask a supplier to show a project where the material is already working before they will put it in a township
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  12. 12
    There is no formal installer training; installers learn on site from contractors, and poor workmanship damages the product's reputation
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  13. 13
    In a downturn, total installed cost is the decisive criterion for the choice of wall and ceiling material
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  14. 14
    Up-market developers are more willing to trial new materials than mass-market ones
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  15. 15
    Main contractors keep long-standing sub-contractors; switching wall systems means finding new trades and extra coordination
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  16. 16
    Rehda survey of 166 member developers in Peninsular Malaysia: 72% reported financing issues in the second half of 2025, and 60% reported unsold completed residential units as at 31 Dec 2025
    Public source · The Edge Malaysia, 23-29 Mar 2026 · link
  17. 17
    Under the Housing Development (Control and Licensing) Act sale and purchase agreement, vacant possession is due within 24 months of the agreement for landed property (Schedule G) and 36 months for strata property (Schedule H); late-delivery damages run day to day at 10% per annum of the purchase price
    Public source · Y Kong, Wong & Partners, 11 Aug 2025 · link
  18. 18
    A fixed completion deadline after the sale agreement, with penalties for delay, makes speed of construction valuable to developers
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  19. 19
    Cheap foreign labour removed the incentive to switch from wet trades to faster dry methods
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  20. 20
    Construction work done in Malaysia rose 8.8% to RM47.8 billion in the second quarter of 2026; residential buildings were RM10.9 billion, a 22.8% share, up 8.7%
    Public source · Department of Statistics Malaysia, Construction Statistics Second Quarter 2026, Aug 2026 · link
  21. 21
    Ministry of Housing and Local Government Circular 4/2024, effective 10 July 2024, made an IBS Score of 70, up from 50, a condition for building plan applications on projects of RM50 million or more with a gross floor area of at least 50,000 sq m; approvals remain with each local council and not all councils have adopted a mandatory minimum; CIDB acts as external technical agency in the one-stop centre committee; developers cited IBS costs about 5% to 15% higher than traditional methods
    Public source · The Edge Malaysia Weekly, 22-28 Jul 2024 · link
  22. 22
    The CIDB levy is 0.125% of the total contract value on projects valued above RM500,000
    Public source · CIDB Malaysia, levy information page, accessed Oct 2026 · link
  23. 23
    Homes rely on brick party walls for fire separation; fire department enforcement is strict on non-residential buildings and light on home renovation
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  24. 24
    Government projects require local materials
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  25. 25
    Show houses, live demonstrations and reference projects in similar climates are the main trust-builders for a new building material; local designers copy Singapore, so Singapore projects carry weight
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  26. 26
    Architects worry that board walls look cheap and lower resale value against brick; their other concerns in a hot, humid climate are moisture and mould, acoustics, hanging heavy items and termites
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  27. 27
    Buyers read brick as solid and safe; the word 'board' signals weakness, and a hollow sound when knocked puts buyers off; durability and solidity are the main doubts
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  28. 28
    Plasterboard is used mostly for ceilings, partitions in large rooms and renovation work; plasterglass, supplied by fragmented small firms, has been the cheaper rival for residential ceilings
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  29. 29
    Better-travelled, better-educated, younger buyers who redecorate often and hang few items are the likely early adopters of lightweight walls
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  30. 30
    Most buyers want a complete layout and find open-concept self-partitioning too much hassle
    KIRA field interviews · KIRA field interviews, Klang Valley, Penang and Johor
  31. 31
    Unsold completed residential units rose 7.6% on the previous quarter to 32,801 in Q1 2026, valued at RM16.37 billion; condominiums and serviced apartments make up most of the unsold stock, and the overhang has reached suburban condos in Johor and the high-rise belt on Penang Island
    Public source · NAPIC figures reported by Rummah News, 18 May 2026 · link

Key points

Practitioner views from KIRA Experts transcripts: modelled interviews built on KIRA's field interviews. How we work: Methodology.