Competitive landscape · Expert interview

Who wins the small steel building in Vietnam: the conventional fabricator, the pre-engineered maker or the ready-built factory

Format
Modelled interview
As of
October 2026
Market
Vietnam
Industry
Steel construction
Length
≈ 30 min read
PebsteelVietnam Steel AssociationMinistry of Industry and TradeSavillsCushman & WakefieldCBREHoa Phat
Modelled interview. Built from KIRA's face-to-face interviews in Vietnam with contractors, steel fabricators and manufacturers, design consultants, regulators and the owners of sheds and small buildings, set in today's market. How the trade works comes from what those people told our analysts; every figure comes from a public source, marked next to the answer.

Summary

  • The contractor, not the owner and not the steel maker, picks the structure for a small building, so whoever wins the contractor's trust wins the specification. 1 2
  • Conventional steel is the default because suppliers are many, technical demands are low and labour looks cheap, while pre-engineered systems are seen as expensive and skill-hungry by small contractors. 3 4
  • Speed is where pre-engineered makers and a third rival, the ready-built factory, win: 410 of 759 newly licensed manufacturing projects leased ready-built space, and one pre-engineered maker, with six factories in Vietnam, claims a 6-8 week erection against 6-12 months. 5 6
  • Institutional, agricultural and home buyers pay on price, relationships or looks, which keeps them with conventional fabricators. 7 8 9
  • Demand underneath is solid: construction steel demand rose about 12% to 10.9 million tons in the first 11 months of 2024, and Savills counts 203 active industrial parks. 10 11
  • Two moving parts for 2026: the new Law on Construction takes effect on 1 July 2026 with wider permit exemptions, and a provisional tariff of up to 27.83% on Chinese hot-rolled steel adds a cost risk. 12 13

Transcript

01Who picks the structure

KAKIRA Analyst

You run a fabrication workshop in an industrial province in the south. What would you want a foreign steel company to understand first about small buildings in Vietnam?

EXExpert

That I do not pick the structure, and the owner mostly does not either. An owner here does not build himself. He hires a contractor he trusts, someone a neighbour used or someone he has worked with before, and that is the end of his shopping around for the structure. 1

The contractor then becomes the one-stop shop: he does the design, handles the permits and the inspections, buys the steel and brings his own sub-contractors, and I am one of them. 14 So when a foreign maker tells me about its product, my first question is whether it has won the contractor, because whoever wins the contractor's trust wins the specification. 2

KAKIRA Analyst

How many contractors are we talking about?

EXExpert

I cannot give you a count, nobody can. The trade is very fragmented, a very large number of small contractors, each with his own habits and his own few fabricators he phones. 15 The owner may still ask a few fabricators or distributors for a quotation before he decides, so the price I give is seen, but the structure was usually chosen before my quotation was asked for. 16

02Why conventional steel is the default

KAKIRA Analyst

Why does conventional steel dominate when pre-engineered systems are a known technology?

EXExpert

Because for a small contractor everything about conventional steel is easy. There are many suppliers, so he can always find a cutter and a welder. The technical requirements are low, so he does not need an engineer to sign off every detail. And the labour looks cheap, since the crews already know how to do it. 3

A small contractor looks at a pre-engineered system and sees something expensive that needs skilled labour, so he rarely recommends it. His reputation is on the line with the owner, and he does not want to be the man who brought in a system his crew cannot put up. 4

KAKIRA Analyst

Is the market for conventional steel growing, or are those contractors in trouble?

EXExpert

The volumes behind us are healthy. The Vietnam Steel Association's members reported construction steel demand up about 12% to 10.9 million tons in the first 11 months of 2024, and the broker forecast I read expected domestic steel demand to rise 10% in 2025. 10 That tells me steel is moving, though it does not tell me how much of it ends up in sheds and small buildings, and I would not pretend to know that. 10

03The pre-engineered camp

KAKIRA Analyst

Who are the pre-engineered makers, and how do they compete with you?

EXExpert

The serious ones are factory-based and sell a complete building, not steel by the kilo. One of them says on its website that it has six large factories in Vietnam with fabrication capacity above 100,000 tonnes a year. That is the company's own statement, but it tells you the scale, a different league from my workshop. 6

Where they compete with me is the larger job. Pre-engineered systems are used mostly for large buildings and seldom for sheds, and the people who know them well are the large contractors, not the small ones who build most of the sheds. 17 A pre-engineered system gains first where the owner already knows it from a big factory building, and then he asks for the same thing at his next, smaller site. 18

KAKIRA Analyst

They advertise speed. Is that real?

EXExpert

Speed is the argument, yes. The same company claims a 3,000-5,000 m2 industrial building can be erected in just 6-8 weeks, against 6-12 months for equivalent conventional construction. 6 I would take that as the seller's line, not as a measurement: the same page quotes other durations for conventional building elsewhere, and my own jobs depend on the site, the permit and the weather. 6 But the direction is right. A frame that comes from a factory with the drawings finished is faster than a frame I design as I go. 19

04Resellers, fabricators and who else is in the field

KAKIRA Analyst

Apart from the pre-engineered makers and fabricators like you, who else sells small steel buildings?

EXExpert

A lot of manufacturers do not sell buildings at all. Many sell steel and roofing through resellers and retail shops and supply the materials, not the full solution. 19 Some fabricators, like me, have their own design and erection teams and work as sub-contractors on the contractor's project. 19

For a stand-alone shed, the job goes to a small contractor, a fabricator or a materials shop. If the shed is part of a bigger project, the main contractor manages it and the smaller players are just sub-contractors under him. 20 Outside the big cities the reach comes from agents and hardware retailers, who are everywhere but cannot give design advice, and that is the gap where a fabricator with a drafting desk makes a living. 21

05Where speed pays and where it does not

KAKIRA Analyst

Which customers actually pay for speed?

EXExpert

Factory and shop owners. For them an extra shed is a need, not a luxury, because a late building means lost production. I cannot tell you the size of the premium today, it depends on the customer and on how badly he needs the space. They want a hassle-free process and a budget they can trust, and they were willing to pay a premium for that. 22

Institutions are a different world. Their buildings go through tenders where relationships and price dominate, speed comes second, and the design often arrives from the district office. 7 Livestock and farm owners are mostly sole proprietors with very little willingness to pay, and they worry about steel rusting in the sheds. 8 And a homeowner who wants a carport worries about looks and calls the nearest fabricator or materials shop. 9

06The third rival: ready-built factories

KAKIRA Analyst

You said pre-engineered makers are your competitor. Is there anyone else who takes small-building work away from both of you?

EXExpert

Yes, the developer who rents the owner a finished factory. The figures I read: of 759 newly licensed manufacturing projects, 410, or 54%, leased ready-built facilities. 5 Supply is about 11 million sq m at occupancy above 85%, and rents run 4-6 USD per sq m per month in the north and 5-7 USD in the south. 5

The same article says self-development costs 3-6 million USD in land and construction, excluding permits, and that leasing can save 70-80% of the initial investment. 5 For the foreign investor with a tight timeline, that is the real alternative to calling a fabricator. I lose those customers, but they do come back: the tenant adds a canopy, a mezzanine or an extra warehouse, and that is a small job for a fabricator like me. 22

KAKIRA Analyst

Is industrial land demand strong everywhere?

EXExpert

No, it differs by region. CBRE put 2024 occupancy at 80% in the north and 89% in the south, but southern absorption fell 52% to 265 ha, and Savills counts 203 active industrial parks. 11 In central Vietnam, transactions nearly doubled in the first half of 2025, though occupancy is about 70%. 23 I read this as new zones coming up outside the old centres, and where there is a new zone there are tenants who will need sheds. 11

07Permits, inspections and the new law

KAKIRA Analyst

You say contractors handle permits. How much of a differentiator is that?

EXExpert

A big one. Permit approval is slow, inspections can suspend work, and the owner has no idea how to speed it up. The contractor, or a consultant he works with, expedites it, so a fabricator or contractor who takes the permit off the owner's hands has a real selling point. 24 For non-residential projects the fire safety and environment reports have to be ready before the permit comes. 25

KAKIRA Analyst

The Law on Construction was amended last year. What changes for you?

EXExpert

I am waiting for the decrees, honestly. The National Assembly adopted the amended law on 10 December 2025, and it takes effect on 1 July 2026. It widens the list of works exempt from a construction permit, including works under projects whose feasibility studies were approved, and grade 4 constructions and small private residences under seven stories and 500 m2 outside areas with specific architectural rules. 12 Guiding decrees are expected to put the permit process online with a maximum of 7 to 10 days, but that was in the ministry's September draft, so I will believe it when I see the final decree. 12

If it works, the permit stops being something I sell, and the contractor who sold himself on handling permits loses an edge. Then the competition moves to price and speed, which suits a pre-engineered maker with a factory more than it suits me. 24

08Steel prices, duties and advice to a newcomer

KAKIRA Analyst

What worries you about steel prices?

EXExpert

Imported hot-rolled steel from China. On 2 April the Ministry of Industry and Trade issued Decision No. 612/QD-BCT, a provisional tariff of up to 27.83% to curb circumvention of the anti-dumping duties set by Decision No. 1959/QD-BCT of 4 July 2025. The ministry said the import surge caused significant injury to the domestic steel industry. 13 What it does to my buying price I cannot say, it depends on the grade and the supplier I use. 13

KAKIRA Analyst

A Japanese or Korean building-products company wants a share of this market. What should it do?

EXExpert

Do not sell to the owner first. Win a handful of contractors and give them what they need: drawings, a quotation they can use, help with the permit. 2 Remember they see pre-engineered systems as expensive and skill-hungry, so show them it is not, with a crew they can watch put up one building. 4

And aim first at the owners who already know the system from a factory building, and at the industrial-zone customers who pay for speed. 18 22 Do not bet on the institutions or the farms, they decide on price and relationships. 7 8

KAKIRA Analyst

What would change your mind, and what worries you?

EXExpert

If a pre-engineered maker showed small contractors an erection crew and a price that matched my conventional frame, I would start recommending it myself. 4 What worries me is that the ready-built factory developers keep taking the fast, well-funded customers away from every one of us. 5 And a tariff can raise my steel cost, since the ministry itself calls the import surge an injury to the domestic industry. 13

Sources and basis

  1. 1
    Vietnamese owners do not build themselves; they hire a contractor they trust, chosen through peer referral or past experience
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  2. 2
    Contractors are the gatekeepers in small buildings; whoever wins the contractor's trust wins the specification
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  3. 3
    Conventional steel dominates small buildings because of the many suppliers, the low technical requirements and a perceived low labour cost
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  4. 4
    Small contractors often see pre-engineered light steel as expensive and needing skilled labour, so they rarely recommend it
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  5. 5
    Vietnam's FDI report: 759 newly licensed manufacturing projects, up 40%, of which 410 (54%) leased ready-built facilities; ready-built factory supply of about 11 million sq m at occupancy above 85% in Q2 2025 (Cushman & Wakefield); rents of 4-6 USD per sq m per month in the north and 5-7 USD in the south; self-development costs 3-6 million USD in land and construction excluding permits, and leasing can save 70-80% of the initial investment
    Public source · Vietnam News Agency via VietnamPlus, 8 Sep 2025 · link
  6. 6
    Pebsteel's own website, 6 Apr 2026 (the company's own marketing statement): six large-capacity factories in Vietnam with fabrication capacity above 100,000 tonnes a year; claims a 3,000-5,000 m2 industrial building can be erected in just 6-8 weeks versus 6-12 months for equivalent conventional construction; the same page gives other conventional durations elsewhere
    Public source · Pebsteel Vietnam website, Steel Building Insights, 6 Apr 2026 · link
  7. 7
    Institutional buildings go through tenders where relationships and price dominate and speed is secondary; the design often comes from the district office
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  8. 8
    Agricultural owners are mostly sole proprietors with very low willingness to pay and doubts about steel corrosion in livestock sheds
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  9. 9
    Homeowners treat a shed as a nice-to-have; looks are the main objection to light steel sheds, and for low-value sheds they go to the nearest fabricator or materials shop
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  10. 10
    Vietnam Steel Association members in the first 11 months of 2024: construction steel demand up about 12% year on year to 10.9 million tons; galvanized steel demand 5.05 million tons, up 32.8%; SSI Securities expected domestic steel demand to rise 10% in 2025
    Public source · The Investor, 3 Jan 2025 (reporting VSA and SSI Securities data) · link
  11. 11
    Savills Hanoi counts 203 active industrial parks and more than 38,200 ha of industrial land, up 5% from the previous year; CBRE puts 2024 occupancy at 80% in the north and 89% in the south, with southern absorption down 52% to 265 ha; the article also mentions over 400 planned zones with about 300 operating and does not reconcile the counts
    Public source · Vietnam Briefing, 11 Feb 2025 (reporting Savills and CBRE) · link
  12. 12
    Vietnam's National Assembly adopted the amended Law on Construction on 10 December 2025, effective 1 July 2026, replacing Law No. 50/2014/QH13; the law exempts eight groups of works from a construction permit, among them works under projects whose feasibility studies were approved by competent authorities, and grade 4 constructions and small private residences (under seven stories and 500 m2 total floor area) outside areas with specific architectural rules; guiding decrees are expected to move the permit process online with a maximum of 7 to 10 days; the article rests on the Ministry of Construction's September draft because the final text was not yet published
    Public source · Tilleke & Gibbins, 15 Dec 2025 · link
  13. 13
    On 2 April 2026 the Ministry of Industry and Trade, by Decision No. 612/QD-BCT, imposed a provisional tariff of up to 27.83% to curb circumvention of the anti-dumping duties on hot-rolled steel from China set by Decision No. 1959/QD-BCT of 4 July 2025; the ministry said the import surge caused significant injury to the domestic steel industry
    Public source · Vietnam News, 2 Apr 2026 · link
  14. 14
    Contractors act as a one-stop shop for the owner: design, permits, inspections, materials sourcing and a network of sub-contractors
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  15. 15
    The small-building trade is very fragmented, with a very large number of small contractors serving it
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  16. 16
    Owners commonly ask for quotations from a few fabricators or distributors before deciding
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  17. 17
    Pre-engineered systems are used mostly for large buildings and seldom for sheds; awareness of them sits with large contractors, and small contractors who build sheds know them less
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  18. 18
    Pre-engineered systems gain first where owners already know them from large factory buildings
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  19. 19
    Many manufacturers sell through resellers or retail and supply materials rather than full building solutions; some fabricators have in-house design and erection teams and act as sub-contractors on projects
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  20. 20
    Sheds built together with a main facility are managed by the main contractor; stand-alone sheds go to small contractors, fabricators or materials shops
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  21. 21
    Outside the main cities, national coverage needs agents or hardware retailers, but they cannot give design advice
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  22. 22
    For factories and shops an extra shed is a need, because construction delays mean operational loss; industrial and commercial owners value a hassle-free process and budget control and were willing to pay a premium for it
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  23. 23
    Central Vietnam industrial property: transactions nearly doubled in the first half of 2025 compared with the previous year (Savills); occupancy about 70%; average industrial land rents about $70 per square meter per lease cycle in Q2/2025 according to the Ministry of Construction, largely stable
    Public source · The Investor, 22 Aug 2025 · link
  24. 24
    Permit approval is slow and inspections can suspend work; consultants and contractors expedite them, so handling permits for the owner is a real selling point
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade
  25. 25
    Fire safety and environment reports are required before a permit for non-residential projects
    KIRA field interviews · KIRA field interviews, Vietnam small-building trade