Why Indonesian owners still build warehouses the conventional way, and how a steel contractor gets a pre-engineered kit into the job
Summary
- Conventional site-built steel and brick still win most warehouse and shed jobs, because cheap labour makes customisation inexpensive and many contractors see little value in a kit's speed; Jakarta's 2026 minimum wage of Rp 5,729,876 a month, up 6.17%, is the number that would have to keep rising to change that. 1 2 3
- Owners rank value for money and durability first and plan sheds well ahead, so speed is a weak selling point; industrial owners are the most open to standard buildings but few will pay a premium. 4 5
- The buying run is a few quotes for small owners and a project-department tender for large ones, with the contractor and owner deciding on small jobs. 6 7
- Warehouse demand is strong at the top end: nearly 490,000 m² of modern space was absorbed in Greater Jakarta in 2025, with occupancy at 96% by Q4, in a market dominated by Chinese investment. 8
- Steel is a price game: imports supplied 55% of finished-steel consumption in 2025, China 46% of import volume, and domestic producers run at only 50 percent of capacity, so material quotes move fast. 9 10 11
- District-level building rules block a nationwide pre-approved design; the 2025 licensing regulation sets maximum processing times for building approvals and a deemed-granted rule, which may shorten the permit chain without removing local rules. 12 13
Transcript
01The warehouse is still built the old way
You build warehouses and small factories around Greater Jakarta. Why do owners still build them the conventional way?
Because the conventional way is cheap to change. Labour here is inexpensive, so if an owner wants a different column spacing, a mezzanine for the office, a taller door, my yard welders just do it, and nobody feels the cost. 1 The Jakarta minimum wage for 2026 is Rp 5,729,876 a month, up 6.17% from last year. 3 That is not nothing, but it is still a wage where customising on site beats designing a standard building. 1
And honestly a lot of my own colleagues do not know what a pre-engineered building is, or they know the name and see no value in the speed and the neatness. They ask me what is wrong with a steel frame we fabricate ourselves. I have no good answer to that. 2
Is that a problem of knowledge, or of price?
Both. When I show a kit to a client or to another contractor, the first two objections are the same every time: it looks plain and it must be expensive. 14 I cannot say whether it is really more expensive on every job, because it depends on the span, the steel price that month and how many changes the owner wants. 15 But the perception sits in the room before I open my mouth. 14
02Who decides, and how
Walk me through how a warehouse owner picks a builder.
Small and mid-size owners call several contractors and compare quotes. Large companies run a tender through their project department, with drawings, a bill of quantities and a few rounds of negotiation. 6 I know which one I am in the moment the phone rings: if the caller asks for a price in a day, it is a quote contest. 6
On the smaller jobs it is the owner and me. An architect or consultant only gets a real say on the bigger projects. 7 If the owner is a hotel group or a school or a bank branch, you win through relationship or through a friend who has used you before, and they lean to brick and concrete because it is what they know. 16
What do owners ask first?
Is it good value and will it last. Not how fast. Most owners plan the warehouse many months ahead, so a fast build does not impress them. 4 I have lost count of owners who told me they would rather have a thicker purlin and a better coating than a finish date two weeks earlier. 4 The industrial owners are the exception in one way: they care about function, not looks, so they will listen to a standard building, as long as it is not dearer. 5
03Demand today and who builds for it
How busy is the warehouse market for you right now?
The good money is in the industrial estates. JLL says modern warehouse absorption in Greater Jakarta reached nearly 490,000 m² in 2025, a record, and occupancy went from 90% in Q1 to 96% in Q4. 8 The activity was dominated by Chinese investment, and the main demand came from electronics, automotive and food and beverage. 8
Those tenants tell the landlord what they need. JLL itself says they look for ready-to-lease space with specific technical requirements, and for hybrid warehouses that combine storage with assembly and repair. 17 For me that means more mezzanines, heavier floors, more crane beams. That is the kind of work where a standard kit is the starting point and my yard is the rest. 18
Is new supply keeping up?
I do not track the landlords' pipelines, so ask them. What I can say is what JLL reported early in 2025: vacancy fell to 9.5%, and only 1 new project of 7,200 sqm came to market in that quarter. 17 A tight market makes owners impatient, but it also makes them pick builders they already know. 16
04Steel, imports and the price you quote
Where do you buy your steel?
It depends on the item. Large mills may skip the small shops and sell direct to contractors or to the project owner. Some mills supply material only and give the erection to a subcontractor. And some of us, like me, buy material and fabricate and install ourselves. 19 Coated roofing and wall sheet I buy from distributors and roll-formers, structural sections wherever the price is right that week. 19
You cannot talk steel without talking about imports. SMM puts imports at 55% of finished-steel consumption in 2025, with China alone at 46% of import volumes. 9 The Industry Ministry says domestic steel producers run at only 50 percent of capacity. 10 So the mills are hungry and the quote I got on Monday can be old by Friday. 11
Does a rising steel price hurt you against brick?
Less than people think. When all materials rise, the gap between steel and the substitutes narrows, and that helps steel. 15 SMM reports that construction took 78% of steel consumption in 2025, so my trade is the mills' main customer and they know it. 9 When the price of steel falls I must be careful too: my customer reads the same news and asks for a discount. 6
05Channels for a pre-engineered supplier
If a foreign supplier wanted to sell light steel buildings here, who should it sell through?
Not through its own shops. In my experience the practical route is agents and resellers who already have a line to big corporations, because that is how pre-engineered buildings mostly get sold. 20 Direct sales exist, but they are the minority. 20 The second route is us, the steel contractors with a fabrication yard, because we are the natural partner for a light-steel supplier. 18
Large plantation groups are a special case. They buy in volume and expect the supplier to come to them and take care of everything, while the small farmer goes to a carpenter. 21 If I were the supplier I would pick the industrial and the big plantation customer first and leave homeowners alone. 5 21
What would you want in a partnership deal as a contractor?
Do not take my erection job away. I want the kit, the engineering and the technical help, and I keep the customer and the site. If the supplier goes direct to my client behind my back, the partnership ends the same week. 18 I also want the freedom to modify, since owners here ask for changes all the time. 1
06Permits, rules and the 2025 change
Why can't a supplier get one standard design approved and use it everywhere?
Because the building rules are set by the district: the design standard, the permit, how much of the plot you can cover, the setbacks. A design approved in one district is not approved in the next, and the permit chain is long. 12 That, more than looks or price, is why I do not see a nationwide catalogue building working here. 12
There is something new. Government Regulation No. 28 of 2025 took effect on June 5, 2025, and the online system had to be updated by October 5, 2025. Building approvals now come with service-level agreements, maximum processing times, and a fully compliant application that is not decided in time is treated as granted. 13 That is the law as written. I will believe it when my permit clerk in the district office treats it so. 12
Does that make a standard building easier?
07Advice to a newcomer, and what worries me
What should a foreign steel-building supplier do first?
Start with industrial estate tenants and large corporations, who care about function and are open to fast quotation. Offer value and durability, and keep the speed argument in second place. 5 4 Find two or three steel contractors with a good yard and work through them, since owners here like to see a local name on the job. 18
And do not sell looks. If your building is plain, fine, but say so and give the owner a way to dress the front. Plain was the objection every time. 14
What would change your mind about conventional building?
If wages keep climbing and the cost of customising on site keeps climbing with them, owners will start asking why they pay my welders for what a factory could do. 3 1 And if a supplier can show me one real project in my district built with its kit, permitted and on time, I would take the next call seriously. 12
What worries me is steel itself. With imports at 55% of finished-steel consumption and domestic producers at only 50 percent of capacity, price is set far from my yard. 9 10 Cheaper imports hurt the mills and the fabricators alike, and a margin I quote today can be gone by the time the steel arrives. 11
Sources and basis
- 1Brick and mortar and conventional site-fabricated steel dominate small and mid-size sheds, because cheap labour makes customisation inexpensiveKIRA field interviews · KIRA field interviews, Indonesia
- 2Many contractors are unaware of pre-engineered building concepts and see little value in their speed and convenienceKIRA field interviews · KIRA field interviews, Indonesia
- 3The 2026 provincial minimum wage of Jakarta is Rp 5,729,876 a month, up 6.17% (Rp 333,115) from Rp 5,396,761 in 2025, announced by the governor on 24 December 2025Public source · InvestorTrust, 24 Dec 2025 · link
- 4Owners rank value for money and durability of the structure first; speed matters little because owners plan sheds well aheadKIRA field interviews · KIRA field interviews, Indonesia
- 5Industrial owners care about function more than looks and are the most receptive to standard steel sheds and fast quotation, but few would pay more than for a conventional solutionKIRA field interviews · KIRA field interviews, Indonesia
- 6Customers usually collect quotes from several contractors; larger firms run tenders through a project departmentKIRA field interviews · KIRA field interviews, Indonesia
- 7Architects and consultants influence material choice only on larger projects; on small sheds the owner and the contractor decideKIRA field interviews · KIRA field interviews, Indonesia
- 8Modern warehouse absorption in Greater Jakarta reached nearly 490,000 m² in 2025, surpassing the previous record set in 2023; occupancy rose from 90% in Q1 2025 to 96% in Q4 2025; market activity was dominated by Chinese investment driven by strong manufacturing demand, and the main demand came from electronics, automotive, and food and beverage (as stated by JLL Indonesia)Public source · InvestorTrust, reporting JLL Indonesia, 12 Feb 2026 · link
- 9Indonesia steel market, 2025: construction accounted for 78% of steel consumption, with transportation next at 8%; imports supplied 55% of finished-steel consumption, and China alone accounted for 46% of import volumesPublic source · SMM (Shanghai Metals Market) analysis, 31 Aug 2026 · link
- 10According to the Industry Ministry domestic steel producers run at only 50 percent of capacity; the ministry points to an influx of cheaper goods from China, and subdued demand is cited alongside itPublic source · The Jakarta Post, 11 May 2026 · link
- 11Cheaper imported steel products add price competition for domestic mills and fabricatorsKIRA field interviews · KIRA field interviews, Indonesia
- 12Building rules such as design standard, permit, plot coverage and setback vary by district, so a standard design cannot be pre-approved nationwide and the permit chain is longKIRA field interviews · KIRA field interviews, Indonesia
- 13Government Regulation No. 28 of 2025 on risk-based business licensing took effect on June 5, 2025; the online licensing system had to be updated no later than October 5, 2025; building approval (PBG) and building worthiness certificates (SLF) are now subject to service-level agreements with maximum processing times, and if an application in full compliance with substantive and administrative requirements is not decided within the time the licence is deemed granted; post-approval audits and revocation remain possible where data was misrepresented or material requirements were not metPublic source · SSEK Law Firm legal update on GR 28/2025, 18 Aug 2025 (via Legal500 Intelligence); secondary summary, implementing rules were still pending · link
- 14Contractors object to standard steel sheds as plain in design and perceived as expensiveKIRA field interviews · KIRA field interviews, Indonesia
- 15Rising material prices narrow the gap between steel and its substitutes, which helps steelKIRA field interviews · KIRA field interviews, Indonesia
- 16Commercial and institutional owners pick contractors by relationship or a friend's referral and prefer traditional constructionKIRA field interviews · KIRA field interviews, Indonesia
- 17Greater Jakarta warehouse market, Q1 2025: vacancy fell to 9.5% and modern warehouse occupancy rose from 87% to 90%; only 1 new warehouse project, of 7,200 sqm in Tangerang, entered the market; JLL cited Chinese companies in electric vehicles, electronics, home appliances and fast-moving consumer goods that need ready-to-lease facilities with specific technical requirements, and demand for hybrid warehouses combining storage with assembly and repairPublic source · Expat Life Indonesia, reporting JLL, 8 May 2025 · link
- 18Steel contractors with their own fabrication capability are the natural partners for light steel building suppliersKIRA field interviews · KIRA field interviews, Indonesia
- 19Large steel players may bypass small retailers and sell direct to contractors or project owners; some mills supply materials only and subcontract installation, while some steel contractors buy materials and fabricate and install themselvesKIRA field interviews · KIRA field interviews, Indonesia
- 20Agents and resellers with strong links to large corporations are the main route for selling pre-engineered buildings; direct sales are a minorityKIRA field interviews · KIRA field interviews, Indonesia
- 21Large plantations buy in volume and expect suppliers to come to them with a full service; small farmers stick to carpenters and traditional buildersKIRA field interviews · KIRA field interviews, Indonesia