Customer voice · Expert interview

Who really picks the light fittings in a Singapore building project: developer, consultant or contractor

Format
Modelled interview
As of
October 2026
Market
Singapore
Industry
Lighting (LED lamps and luminaires)
Length
≈ 30 min read
Building and Construction AuthorityHousing and Development BoardNational Environment AgencyCushman and Wakefield
Modelled interview. Built from KIRA's face-to-face interviews with developers, building owners, public facilities managers, architects, M&E consultants and lighting designers in Singapore, set in today's market. How the trade works comes from what those people told our analysts; every figure comes from a public source, marked next to the answer.

Summary

  • The payer, the specifier and the purchaser are three different people: the developer decides on budget and return, consultants and designers write the performance, and the contractor proposes and buys the brand. 1 2 3
  • A consultant seldom names a brand on a large project; a maker wins by being the brand that fits the written performance, through presentations and workshops with designers and consultants. 4 5
  • Energy rules now sit inside the specification: Green Mark 2021 asks for at least a 50% improvement over 2005 levels, and since 1 Apr 2024 every lamp sold must reach at least 100 lm/W. 6 7
  • Existing buildings are a second door: from 30 September 2025 owners of energy-intensive buildings of 5,000 m² or more must cut energy use by 10% and engage a qualified professional within 90 days. 8
  • Public housing is the volume story: Town Councils have started replacing approximately 300,000 end-of-life LED lights with smart LED lighting that can cut lighting energy by up to 60%, and retrofits are phased so suppliers can change. 9 10
  • Construction demand stays steady at S$47-53 billion for 2026 but is projected to average between $39 billion and $46 billion a year over 2027 to 2030, so specification wins matter more than volume. 11

Transcript

01Three people, three decisions

KAKIRA Analyst

You specify lighting for commercial buildings. When a developer says 'we chose the light fittings', who is that really?

EXExpert

Usually nobody who says it. In a building project the person who pays, the person who specifies and the person who buys are three different people. The developer pays, my office and the lighting designer write the performance, and the contractor is the one who buys the actual fittings. A maker who only visits the developer has talked to the wrong third of the chain. 1

The developer decides on budget, output and how much he gets back from energy savings. He seldom cares about the brand, and he relies on the architect, the M&E consultant and the lighting designer to tell him what is fit. 2 The contractor is the true purchaser. He brings a brand for approval through his own supplier network, and the question for me is whether it meets what I wrote. 3

KAKIRA Analyst

So if I want to sell, who do I call first?

EXExpert

All three, and in a different order than you expect. The consultant and the designer first, because that is where the performance gets fixed. Then the contractors, because they carry the submission. The developer last, with the return on investment figure, since that is the only thing he decides on. A maker who works only one of the three loses the project to somebody who works all of them. 1

02What a specification really says

KAKIRA Analyst

When you write the lighting section, do you name a brand?

EXExpert

On a large project, rarely. I set the system and its performance, and the brand is left to the submission stage. On a small retrofit I may refer a brand or two, because there is no design team around and the owner wants somebody to point. 4 That is the thing outsiders get wrong: they expect a name on the drawing and there is none, only a performance. 4

What goes into that performance? In my experience the order is colour rendering and reliability first, then control of the budget, then looks. 12 On the facade and feature lighting it is different. There the lighting designer carries most weight, and I follow what the designer wants as long as the electrical side works. 13

KAKIRA Analyst

Then how does a manufacturer get into your thinking?

EXExpert

By turning up regularly and being useful. The makers who win specifications run presentations and workshops for designers and consultants, and they come back. 5 The leading brands also have project teams who find leads, give technical advice and chase tenders, and then pass the orders and the bidding paperwork through one or two appointed distributors. 14 I have never been moved by a brochure. I have been moved by an engineer who sat down and helped me size a ceiling grid. 5

03The energy rules inside the spec

KAKIRA Analyst

How much of your lighting design is now driven by energy rules?

EXExpert

More every year. For a building that seeks certification, Green Mark 2021 asks for at least a 50% improvement over 2005 levels, and Platinum at least 55%. 6 Under the same scheme new and existing buildings must meet at least a 40% improvement. 6 Lighting is one of the cheaper ways to find savings, so it is the first line I look at when the mechanical side is already tight. 6

But I will be honest, lighting counts for a small share of the points in a green rating, and owners may well spend on air-conditioning and ventilation first. 15 So I do not walk in assuming the owner wants the best fitting. I walk in asking what the owner needs to hit and what is the cheapest way to do it. The ceiling bill for lighting is small next to chillers, and owners know it. 15

KAKIRA Analyst

And the products themselves? Is the regulator setting a floor?

EXExpert

Yes, and it is a hard floor. From 1 Apr 2024 all single-phase lamps sold in Singapore must meet the minimum energy performance standard and carry the energy label, and for LED lamps and tubes the minimum is 100 lm/W. 7 The top rating, four ticks, needs at least 160 lm/W, and a supplier who breaks the rule faces a fine not exceeding $10,000. 7 That removes the cheapest imports from my list, but it does not tell me whether a product will still be alive in a few years. Reliability is something I judge on my own. 12

And I keep one eye on the claims. Building managers think many manufacturers overstate their energy savings, and so do I. When a brochure says a number I ask for the test report and for a site where it is running. 16 Cheap early imports that failed left people thinking LED is unreliable, and long warranties and a good record are what bring them back. 17

04Existing buildings and the 2025 rule

KAKIRA Analyst

Most of Singapore's floor area is already built. Is the existing-building market opening up for lighting?

EXExpert

It is, in a regulated way. The Mandatory Energy Improvement regime started on 30 September 2025 for energy-intensive buildings of 5,000 m² gross floor area or more, including offices, hotels, retail, healthcare and institutional buildings. 8 The owner must cut the building's energy use by 10% from the average of the past 3 years before the notice. 8 And he must engage a qualified professional within 90 days to carry out the audit. 8

The timeline is not fast. The audit report is due within 1 year of the notice and the measures within 3 years of submitting the plan. 8 But I already see owners calling me earlier than the notice, because nobody wants to be in the 90 days with no plan. For a mall or an old office, lighting is almost always on the first page of the list, because it is the least disruptive thing to change on a working floor. 8

KAKIRA Analyst

Do owners decide on lighting differently in a retrofit than in a new project?

EXExpert

A little. The developer's reasoning is plain: what is the return on this retrofit? Which brand the contractor brings is secondary, as long as it can be proven. 18 In the common areas, the practice is to replace the lamps in one sweep, timed to the lamp life, because labour costs more than the lamps. That means a maker's lamp life claim feeds straight into the facility manager's calendar, and he will remember if it was wrong. 19

For new offices the commercial case can be strong. The Minister said in 2025 that developers typically recover their investment in new Green Mark Super Low Energy commercial buildings in about 5 to 6 years, and quoted research that Green Mark Platinum offices can command up to 12 percent higher rents. 20 I treat the rent figure as a secondary number, but it explains why the investment committee listens when I say 'lighting controls'. 20

05Public housing and the public sector

KAKIRA Analyst

Public housing is a very different buyer. How does it tender?

EXExpert

Government work goes to tender on the public procurement portal, and the bidders come from pre-qualified panels of consultants and architects. 21 From 1 June 2026 the listing validity of the Public Sector Panels of Consultants has been extended from one year to three years, so once you are on a panel you stay on it much longer, and once you are not, the door is shut longer too. 22 My advice to any maker: your consultants must be on those panels, because they are who writes the performance. 21

In public housing the volume is real. The Housing and Development Board says Town Councils have begun replacing approximately 300,000 end-of-life LED lights with smart LED lighting since late 2024. 9 Smart lighting uses motion sensors and analytics, and the Board says it can cut energy used for lighting by up to 60% compared with conventional LED. 9 I would treat that figure as a ceiling and not a promise, like any energy claim from a maker. 16

KAKIRA Analyst

And how do the Town Councils buy that volume?

EXExpert

In phases. They retrofit a part at a time to keep their bargaining power, and to drop the contractor who did badly before. That means the supplier can change between phases, so winning round one is a lease, not a purchase. 10 From the second quarter of 2025 the Board planned to put smart sub-meters in block switch rooms to monitor lightings, water pumps and lifts, so a Town Council will be able to see whether the new lamps really saved anything. 9

That is good news for the honest makers and bad news for the ones who write big numbers in the brochure. The data will show who delivered. 9

06Demand, advice and what worries me

KAKIRA Analyst

Is the construction pipeline helping or hurting?

EXExpert

Helping for now, not forever. The BCA expects total construction demand to remain steady at S$47-53 billion in nominal terms for 2026, after a preliminary S$50.5 billion in 2025, much of it institutional and housing projects. 11 For 2027 to 2030 it projects an average between $39 billion and $46 billion per year. 11 A lower average means fewer projects chasing the same panel of consultants, so the specification you win this year matters more, not less. 11

KAKIRA Analyst

A Japanese or Korean maker wants in. What should it do?

EXExpert

Do not start with the developer's lobby. Start with consultants and lighting designers: run a workshop, bring a real sample, and tell them honestly where your fitting is weak. 5 Then appoint a distributor who can carry the tender paperwork and the contractor relationships, and keep your own project team for specification work. 14 Show colour rendering and reliability first, because those are what I rank first. 12

And do not expect the contractor to push you because he likes you. He proposes what is in his supplier network and what the consultant will approve. 3 If your product is not in that network, it does not exist for him. 3

KAKIRA Analyst

What would change your mind about all this, and what worries you?

EXExpert

If owners started naming brands on large projects, I would have to rethink everything, because it would mean the contractor's role was shrinking. Today I do not see it. 4 What worries me is the claims. The regulator has set a floor on lamp efficiency, but a floor says nothing about how long a fitting lasts or whether the savings on a brochure turn up on the bill. 7 I have seen the cheap-import problem once, and the memory of it still shapes how LED is viewed. 17

So when the next wave of audited retrofits arrives, the makers with long warranties and data from running sites will win, and the makers with only a brochure will go back to being a name on a list. 8 Reputation takes years and one failed batch to lose. 17

Sources and basis

  1. 1
    In building lighting the payer (the developer), the specifier (consultants and designers) and the purchaser (the contractor) are different people, and a brand must work all three
    KIRA field interviews · KIRA field interviews, Singapore developers, consultants and facilities managers
  2. 2
    Developers decide on budget, output and the return from energy savings, and seldom care about brand; they rely on architects, M&E consultants and lighting designers
    KIRA field interviews · KIRA field interviews, Singapore developers and building owners
  3. 3
    Contractors are the actual purchasers: they propose brands for approval through their own supplier networks
    KIRA field interviews · KIRA field interviews, Singapore developers and building owners
  4. 4
    Specifiers set the lighting system and its performance but on large projects rarely choose the brand directly; on small retrofits they may refer brands
    KIRA field interviews · KIRA field interviews, Singapore architects and M&E consultants
  5. 5
    Manufacturers win specifications through regular presentations and workshops with designers and consultants
    KIRA field interviews · KIRA field interviews, Singapore architects and M&E consultants
  6. 6
    Singapore's climate-action page on buildings: Green Mark 2021, launched in September 2021, requires at least a 50% energy performance improvement over 2005 levels for certification and Platinum at least 55%; under Green Mark 2021 new and existing buildings must meet at least a 40% improvement over 2005; Super Low Energy buildings must achieve at least a 60% improvement over 2005 building codes; the 80-80-80 in 2030 targets are 80% of buildings by gross floor area green, 80% of new developments Super Low Energy from 2030 and an 80% energy-efficiency improvement for best-in-class buildings; the Mandatory Energy Improvement regime was introduced in September 2025 for energy-intensive existing buildings of 5,000 m² gross floor area and above
    Public source · National Climate Change Secretariat, buildings page, viewed Oct 2026 (page updated 2026) · link
  7. 7
    NEA circular of 3 Apr 2024: from 1 Apr 2024 all single-phase lamps sold in Singapore must meet the Minimum Energy Performance Standards and Energy Labelling requirements; the minimum for LED lamps and tubes (and incandescent, CFL types) is 100 lm/W, and 75 lm/W for T8/T5 linear fluorescent tubes; the top 4-tick label needs at least 160 lm/W; non-compliance is an offence with a fine not exceeding $10,000
    Public source · National Environment Agency, circular NEA-LSD-CIRCULAR-ECA-00003-2024, 3 Apr 2024 · link
  8. 8
    BCA Mandatory Energy Improvement regime page: applies to energy-intensive buildings of 5,000 m² gross floor area or more, including commercial buildings (offices, hotels, retail), healthcare and institutional buildings; the Act, Regulations and Code take effect on 30 September 2025; owners must reduce the building's energy consumption by 10% from the average energy use intensity of the past 3 years before the notice; owners must engage a qualified professional within 90 days to conduct the energy audit; the audit report is due within 1 year of the audit notice and the measures within 3 years of the plan submission
    Public source · Building and Construction Authority, MEI regime page, viewed Oct 2026 · link
  9. 9
    HDB Green Towns Programme status annex: HDB is working with Town Councils on smart LED lighting with motion sensors and analytics, which compared to conventional LED lighting can further reduce energy used for lighting by up to 60%; since late 2024 Town Councils have begun replacing approximately 300,000 existing LED lights that have reached the end of their lifespan with smart LED lighting; from 2Q2025 smart electrical sub-meters will be installed in the consumer switch rooms of HDB blocks to monitor common services including lightings, water pumps and lifts
    Public source · Housing and Development Board, Annex on status of Green Towns initiatives, 3 Feb 2025 · link
  10. 10
    Public housing town councils retrofit in phases to gain negotiating power and to drop a contractor who underperforms, so the supplier can change between phases
    KIRA field interviews · KIRA field interviews, Singapore town councils and public facilities managers
  11. 11
    BCA release of 22 Jan 2026: total construction demand is expected to remain steady at S$47-53 billion in nominal terms for 2026; preliminary actual construction demand for 2025 reached S$50.5 billion, within the earlier S$47-53 billion forecast; demand is projected to average between $39 billion and $46 billion per year over 2027 to 2030; the 2025 uptrend was mainly attributed to institutional and housing projects
    Public source · Building and Construction Authority, press release, 22 Jan 2026 · link
  12. 12
    Specifiers rank colour rendering and reliability first, then budget control and aesthetics
    KIRA field interviews · KIRA field interviews, Singapore architects and M&E consultants
  13. 13
    Lighting designers carry the most weight on facade and feature lighting
    KIRA field interviews · KIRA field interviews, Singapore architects and M&E consultants
  14. 14
    Leading brands run project teams that generate leads, give technical advice and win tenders, then route orders and bidding logistics through one or two appointed distributors
    KIRA field interviews · KIRA field interviews, Singapore lighting distributors
  15. 15
    Lighting is a small share of the points in a green building rating, so owners may spend on air-conditioning and ventilation first
    KIRA field interviews · KIRA field interviews, Singapore developers and building owners
  16. 16
    Building managers distrust manufacturers' energy-saving claims and think them overstated
    KIRA field interviews · KIRA field interviews, Singapore developers and facilities managers
  17. 17
    Cheap early imports that failed left customers thinking LED is unreliable; long warranties and proven reliability are what counter that scepticism
    KIRA field interviews · KIRA field interviews, Singapore distributors and building owners
  18. 18
    Developers' decision on a retrofit rests on return on investment, and which brand the contractor brings is secondary
    KIRA field interviews · KIRA field interviews, Singapore developers and building owners
  19. 19
    Common-area lamps are replaced in one sweep, timed to the lamp life, because labour costs more than the lamps
    KIRA field interviews · KIRA field interviews, Singapore facilities managers
  20. 20
    Minister for National Development, 11 July 2025: as of 2024, 61 percent of buildings had been greened by gross floor area, with the target of 80 percent by 2030; about a quarter of new buildings met the Super Low Energy standard in 2024; developers typically recover their investment in new Green Mark Super Low Energy commercial buildings in about 5 to 6 years; Green Mark Platinum offices can command up to 12 percent higher rents, according to Cushman and Wakefield research (secondary figure, quoted by the Minister); over 2,500 buildings certified in 20 years
    Public source · Speech at the Singapore Green Building Council Gala Dinner, 11 Jul 2025, Building and Construction Authority · link
  21. 21
    Government projects are tendered on the public procurement portal, and bidders come from pre-qualified panels of consultants and architects
    KIRA field interviews · KIRA field interviews, Singapore public-sector facilities staff
  22. 22
    Minister for National Development speech of 22 Jan 2026: the listing validity of Public Sector Panels of Consultants is extended from one to three years from 1 June 2026; construction demand is expected at $47-53 billion in 2026
    Public source · Speech at the BCA-REDAS Built Environment and Real Estate Prospects Seminar, 22 Jan 2026, Building and Construction Authority · link

Key points

Practitioner views from KIRA Experts transcripts: modelled interviews built on KIRA's field interviews. How we work: Methodology.

More on Commercial and industrial lighting in Singapore · Commercial and industrial lighting: sales channels across Asia · Commercial and industrial lighting: who decides across Asia · Commercial and industrial lighting: who buys across Asia